NRP,FLAT PANEL DISP

SOL #: SPRPA125RET87Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT PHILADELPHIA, PA
PHILADELPHIA, PA, 19111-5098, United States

Place of Performance

Place of performance not available

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Aircraft Ground Servicing Equipment (1730)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
May 6, 2026
3
Submission Deadline
Apr 2, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Aviation at Philadelphia issued a solicitation for NRP, FLAT PANEL DISP (National Stock Number 1730-01-628-1418). This opportunity was for the procurement of eight (8) units of this critical safety item, which is essential for aircraft launch and recovery systems on shipboard. Proposals were due April 2, 2026.

Scope of Work

This solicitation required the supply of newly manufactured spares only for a Flight Critical, ALRE Critical Application Item. Refurbished, remanufactured, or repaired materials were not acceptable. The item is designated as "Critical material" due to its crucial role in shipboard systems, where failure could lead to serious personnel injury, loss of life, or loss of vital systems/aircraft.

Contract & Timeline

  • Type: Solicitation
  • Quantity: 8 each (increased from 4 via amendment)
  • Response Due: April 2, 2026, 6:00 PM UTC
  • Published: April 3, 2026
  • Set-Aside: None specified. This was a restricted competition for government-approved sources of supply only.

Eligibility & Quality Requirements

Offerors had to be government-approved sources of supply. Distributors were required to provide an authorized distributor letter. The components required engineering source approval by Naval Air Systems Command. Companies not previously approved could submit a Source Approval Request (SAR) by the solicitation closing date, including detailed documentation such as configuration drawings, process sheets, purchase orders, comparative analysis, and inspection method sheets.

Key Quality Requirements included:

  • First Article Testing (FAT): Required for new manufacturers, involving a single uncoated unit. The contractor had to notify the PCO, ACO, and QAR 14 days prior to testing, which would be witnessed by government personnel.
  • FAT Waiver: Possible for offerors who had previously supplied identical production articles accepted by the Government or OEM within the last three years, using the same production facility, and providing a certification. Offerors requesting a waiver had to submit two prices (with and without FAT).
  • Inspection: 100% inspection for critical/major characteristics, plating, hardness, and non-destructive testing. Mandatory 100% PCO inspection at source by the DCMAO QAR.
  • Traceability: A system for individual piece part traceability was required.
  • Warranty: 12 months, 45 days after defect discovery.

Additional Notes

This solicitation was issued under Emergency Acquisition Flexibilities Authority, with synopsis waived due to urgency. All records pertaining to ALRE CSI/CAI manufacture and inspection/test must be provided to the ALRE Cognizant Technical Authority and maintained by LKE QA and the manufacturer for seven years. The amendment increased CLIN 0001 from 4 to 8 units.

People

Points of Contact

BRETT.DUFFEY@DLA.MILPRIMARY

Files

Files

View
View

Versions

Version 4
Solicitation
Posted: May 6, 2026
View
Version 3
Solicitation
Posted: Apr 27, 2026
View
Version 2Viewing
Solicitation
Posted: Apr 3, 2026
Version 1
Solicitation
Posted: Apr 2, 2026
View