NSN, Q-47 DEMOLISH FISHING PIER

SOL #: N4008526R0108Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM MID-ATLANTIC
NORFOLK, VA, 23511-0395, United States

Place of Performance

Norfolk, VA

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Non Building Facilities (Z2PZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 9, 2026
2
Last Updated
Mar 10, 2026
3
Submission Deadline
Apr 7, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM MID-ATLANTIC, is soliciting proposals for the demolition of the Q-47 Fishing Pier at Naval Station Norfolk, Virginia. This project, titled "NSN, Q-47 DEMOLISH FISHING PIER," is a Total Small Business Set-Aside and is issued as a Task Order under an existing Multiple Award Construction Contract (MACC). The estimated budget for this work is between $500,000 and $1,000,000. Proposals are due by April 7, 2026, at 1400 EDT.

Scope of Work

The contractor will provide all supervision, labor, material, and equipment for the complete demolition of the Q-47 Fishing Pier. This includes:

  • Demolition of Superstructure: Removal of utility supports, appurtenances, pier head canopy, railings, precast double tees pier decking, and six concrete electricity poles with foundations.
  • Demolition of Substructure: Removal of beams, pile caps, and bents.
  • Demolition of Piles: Removal of 18 precast concrete piles, cut a minimum of 2 feet below the mudline.
  • Utility Disconnection: Disconnection and demolition of all associated utility lines (electrical, potable water).
  • Demolition of Structures: Removal of the Information Shelter.
  • Site Restoration: Grading, backfilling disturbed areas with clean fill, and re-grading/stabilizing the impacted shoreline.
  • Material Disposal: All demolished material must be disposed of off-base, and the job site cleaned daily.
  • Compliance with U.S. Army Corps of Engineers Safety Health Requirements Manual EM-385-1-1 and submission of an Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA).

Contract Details

  • Contract Type: Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) Task Order.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Product Service Code: Z2PZ - Repair Or Alteration Of Other Non Building Facilities.
  • NAICS Code: 237990 - Other Heavy and Civil Engineering Construction.
  • Period of Performance: 300 calendar days from task order award.
  • Estimated Budget Range: $500,000 to $1,000,000.
  • Liquidated Damages: $318.02 per calendar day for delay.
  • Wage Rate Requirements: Adherence to DoL General Decision Number: VA20260160 for Norfolk, VA.

Submission & Evaluation

  • Proposal Due Date: Tuesday, April 7, 2026, no later than 1400 EDT. Late proposals will not be considered.
  • Submission Method: Electronic proposals via the PIEE Solicitation Module are required. A hard copy submission is also required within three calendar days after the electronic due date.
  • Evaluation Criteria: Award will be made to the responsible offeror submitting the LOWEST PRICE.
  • Eligibility: This solicitation is restricted to MACC contract holders only.
  • Bid Guarantee: Required (Standard Form 24) equal to at least 20% of the offer price or $3,000,000, whichever is less.
  • Proposal Acceptance Period: 120 days from receipt of offers.
  • Required Forms: Price Proposal Form (Attachment H) details CLINs for base demolition and potential additional work (undercut subgrade, contaminated soils, abandoned concrete).

Important Dates & Notes

  • Site Visit: Thursday, March 19, 2026, at 0830 EDT at Q-47, Naval Station Norfolk.
  • Pre-Proposal Inquiries (PPIs) Cutoff: March 24, 2026, at 1400 EDT. Use Attachment F for submissions.
  • Amendments: Will be posted on SAM.gov and PIEE. Offerors are responsible for checking these sites and acknowledging amendments via Attachment I.
  • Funding: Offerors are advised that funding may not become available, and no award will be made if funds are not available. Proposal costs will not be reimbursed.
  • Compliance: Bidders must review Attachment J for critical FAR/DFARS clauses, including those related to waste reduction, sustainable products, security prohibitions, safeguarding defense information, and prohibitions regarding certain procurements.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3Viewing
Solicitation
Posted: Mar 10, 2026
Version 2
Solicitation
Posted: Mar 10, 2026
View
Version 1
Solicitation
Posted: Mar 9, 2026
View
NSN, Q-47 DEMOLISH FISHING PIER | GovScope