NV FTBL 1094(1) Wilson Campground Road

SOL #: 6982AF25B000025Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
6982AF CENTRAL FEDERAL LANDS DIVISI
LAKEWOOD, CO, 80228, United States

Place of Performance

Elko, NV

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Oct 20, 2025
2
Last Updated
Nov 25, 2025
3
Submission Deadline
Nov 25, 2025, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

NV FTBL 1094(1) Wilson Campground Road

PROJECT DESCRIPTION:
The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on the north end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience.

SCOPE OF THE WORK:
The project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements.
Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements.

People

Points of Contact

Denise MartinezPRIMARY
Leslie KarstenSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 8
Solicitation
Posted: Nov 25, 2025
View
Version 7
Solicitation
Posted: Nov 21, 2025
View
Version 6Viewing
Solicitation
Posted: Nov 21, 2025
Version 5
Solicitation
Posted: Nov 19, 2025
View
Version 4
Solicitation
Posted: Nov 19, 2025
View
Version 3
Solicitation
Posted: Nov 12, 2025
View
Version 2
Solicitation
Posted: Oct 29, 2025
View
Version 1
Solicitation
Posted: Oct 20, 2025
View
NV FTBL 1094(1) Wilson Campground Road | GovScope