NWR Shelter Replacement - Perry, Florida

SOL #: 1305M326Q0245Solicitation

Overview

Buyer

Commerce
National Oceanic And Atmospheric Administration
DEPT OF COMMERCE NOAA
SEATTLE, WA, 98115, United States

Place of Performance

FL

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Other Administrative Facilities And Service Buildings (Y1AZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 16, 2026
2
Submission Deadline
Jun 30, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Oceanic and Atmospheric Administration (NOAA) is soliciting quotes for the NWR Shelter Replacement project in Perry, Florida. This opportunity is a Total Small Business Set-Aside for the construction of a new, non-permanently set building to house a VHF 1000 watt transmitter. Quotes are due by June 30, 2026, at 1400 PST.

Scope of Work

The project involves replacing an existing shelter at the NOAA Weather Radio location in Perry, FL. Key requirements include:

  • Demolition and legal disposal of the existing structure and debris.
  • Construction of a new metal siding and metal roof or similar fiberglass structure, approximately 8 ft wide by 10 ft long (not exceeding 9.5 ft by 11.5 ft), with minimum 8 ft ceilings.
  • Site preparation, including planning, power cut-over coordination, and obtaining necessary permits.
  • Foundation work, including inspection, repair, or extension of the existing foundation.
  • Installation of security hardware, a sloped roof, a cable bridge support, and one LED exterior lamp with a dusk-to-dawn sensor.
  • Technical grounding with a copper ground wire "halo," main and secondary ground bus bars, and a 4" PVC pipe bulkhead pass-through.
  • Interior layout with plywood-finished walls, a 100-amp main electrical panel (with two dedicated 220V 20A breakers), 115 VAC quad outlets, and an LED light fixture, all meeting NEC code.
  • Installation of a 1.5-ton mini-split HVAC system capable of maintaining internal temperatures between +50°F and +85°F.
  • Insulation of walls with suitable R-value material and a moisture barrier.

Contract & Timeline

  • Contract Type: Solicitation (RFQ) for a Firm-Fixed-Price award.
  • Product/Service Code: Y1AZ (Construction Of Other Administrative Facilities And Service Buildings).
  • NAICS Code: 236220 (Commercial and Institutional Building Construction) with a $45 million size standard.
  • Estimated Budget: $70,000.00 - $80,000.00.
  • Period of Performance: 120 days after Notice to Proceed (anticipated July 15, 2026, to November 12, 2026).
  • Questions Due: June 24, 2026, at 1400 PST.
  • Quotations Due: June 30, 2026, at 1400 PST.
  • Anticipated Award Date: July 8, 2026.

Evaluation

Quotes will be evaluated using Best Value Trade-Off procedures, considering price and non-price factors. Non-price factors (Demonstrated Prior Experience and Project Schedule) are considered slightly more important than price.

Eligibility / Set-Aside

This acquisition is a Total Small Business Set-Aside.

Additional Notes

  • Quotes and questions must be submitted via the Google Forms linked within the posting and RFQ.
  • Required quote components include a signed SF 1449, signed SF 30 amendments (if any), a Technical Quote (max 10 pages PDF), and a Price Quote (PDF or Excel).
  • Contractors must comply with prevailing wage rates for Taylor County, FL, as detailed in the provided Wage Determination (FL20260026).
  • The contractor is responsible for providing detailed plans/drawings/specifications to the COR at least 45 days before replacement and for pulling all necessary permits.

People

Points of Contact

HARTMAN, HANNAHPRIMARY

Files

Files

View
View
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Jun 16, 2026
NWR Shelter Replacement - Perry, Florida | GovScope