ODF-T FY26 Sac River Access Roadwork
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Harry S Truman Dam & Reservoir, is soliciting proposals for roadway and parking lot rehabilitation at the Harry S. Truman Lake Project Sac Access Roadwork in Warsaw, MO. This is a full and open competition procurement with an estimated magnitude between $100,000 and $250,000. Quotes are due February 9, 2026, at 12:00 PM local time.
Scope of Work
This project involves comprehensive roadwork services for public use areas. The Base CLIN (0001) covers Harry S Truman, Sac River Access HMA Replacement, including pulverizing existing HMA pavement, spreading, compacting, and placing new HMA. Optional CLINs include:
- CLIN 0002: Installation of aggregate shouldering.
- CLIN 0003: Aggregate parking lot rehabilitation (removing/replacing curbs, grading, rock overlay).
- CLIN 0004: Osage Bluff Pavement Crack Fill.
- CLIN 0005: Osage Bluff Bituminous Surface Treatment, including sealcoat application and curb work. Detailed drawings and a supplemental bid schedule provide visual and itemized scope information.
Key Requirements & Clarifications
Contractors must provide all plant, labor, equipment, and materials (not Government Furnished). The period of performance is 270 calendar days from the Notice to Proceed. Environmental compliance with Federal, State, and local laws is mandatory. Recent clarifications confirm seal coating is required (CLIN 0005) in addition to crack filling. Sealer heating is not mandatory if the product meets specifications at ambient temperature. For material approval, a manufacturer's Technical Data Sheet (TDS) or Product Data Sheet is required, not an SDS.
Contract Details
- Contract Type: Firm Fixed Price
- Estimated Value: $100,000 - $250,000
- Set-Aside: Full and Open Competition
- NAICS Code: 237310 (Highway, Street, and Bridge Construction)
- Period of Performance: 270 calendar days from Notice to Proceed.
Submission & Evaluation
Quotes must be submitted via email to cade.s.zelinsky@usace.army.mil and christopher.w.anderson@usace.army.mil in PDF format. Evaluation Criteria: Offers will be assessed based on Price, Relative Experience, and Past Performance. Relative Experience and Past Performance, when combined, are more important than price. Bonding Requirements: Bid Bonds are required (20% of bid price or $3,000,000, whichever is less). Payment and Performance Bonds (100% of awarded contract) are required before NTP, specifically if the offer exceeds $150,000. SAM.gov Registration: Active registration in SAM.gov is mandatory prior to submitting proposals.
Important Dates & Site Visit
- Quote Due Date: February 9, 2026, 12:00 PM local time.
- Last Day for Inquiries: February 2, 2026, 12:00 PM local time.
- Site Visit: Scheduled for January 22, 2026, at 10:00 am CST. Meeting point: 37.998235, -93.734587. Details to attend will be in the solicitation.