OFFICE TRAILER

SOL #: FA813225Q0042Combined Synopsis/Solicitation

Overview

Buyer

TINKER AFB, OK, 73145-3303, United States

Place of Performance

S Coffeyville, OK

NAICS

Manufactured Home (Mobile Home) Manufacturing (321991)

PSC

Prefabricated And Portable Buildings (5410)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Dec 16, 2025
2
Last Updated
Jan 30, 2026
3
Submission Deadline
Dec 22, 2025, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This is an Award Notice for the procurement, delivery, and installation of one Office Trailer for the 76 PMXG at Tinker Air Force Base, Oklahoma. The contract was awarded as a Firm Fixed Price (FFP) agreement under a Total Small Business Set-Aside. The original solicitation sought proposals for a portable office unit meeting specific dimensions and functional requirements.

Scope of Work

The awarded contract covers the purchase, delivery, offloading, and installation of one new portable office trailer unit. Services include site preparation, utility connection readiness, and anchoring at the designated site on the east side of Building 9400, Tinker Air Force Base, OK.

Key Requirements & Specifications

The office trailer must be approximately 65 ft x 30 ft and include:

  • Interior Layout: Four separate office rooms, two bathrooms with hot/cold running water plumbed to existing sanitary sewer, and a kitchenette with sink, plumbing, and provisions for appliances (refrigerators, ice maker, coffee maker).
  • Electrical: A 100-amp, 240-volt power supply, with specified outlet counts per room, common area, kitchenette, and restrooms, including CAT-5 cabling.
  • Access: ADA compliant stairs, platform, and ramp on the south side, aligning with the trailer floor.
  • Furnishings: Laminated countertops, wall-mounted cabinets and shelves in the kitchenette, and space for various appliances.
  • HVAC: A minimum 4.0-Ton A/C system for year-round temperature control.
  • Safety: Smoke alarms in each room, fire emergency pull stations, audio/visual fire alarms, and a fire detection system. Skirting around the perimeter is also required.
  • Installation: A 7-day on-site setup, with the trailer ready for utility connection within 4-6 weeks after contract award. Includes slider windows, screens, mini blinds, and a detachable hitch.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: 100% Small Business Set-Aside
  • NAICS Code: 321991 (Prefabricated Wood Building Manufacturing); Size Standard: 1250 employees
  • Product Service Code (PSC): 5410 (Prefabricated And Portable Buildings)
  • Original Solicitation Due Date: October 24, 2025, 3:00 PM Central Daylight Time

Evaluation Criteria

The original solicitation was evaluated based on the Lowest Total Evaluated Price. The Government also considered terms and conditions, product technical merit, contractor responsibility, and federal performance databases.

Additional Notes

Contractor requirements included a minimum of 10 years' experience in manufacturing/selling mobile office structures, verifiable delivery records for the last 3 years, provision of an initial floor layout, and a one-year warranty. Shipping was FOB Destination (Tinker AFB, OK), with charges included in the quoted price. Payment terms were Net 30, with invoices submitted via Wide Area Workflow (WAWF).

People

Points of Contact

Bridgette MilesPRIMARY
Katherine GalganoSECONDARY

Files

Files

Download
Download
Download
Download
Download

Versions

Version 4
Award Notice
Posted: Jan 30, 2026
View
Version 3Viewing
Combined Synopsis/Solicitation
Posted: Jan 6, 2026
Version 2
Combined Synopsis/Solicitation
Posted: Dec 19, 2025
View
Version 1
Combined Synopsis/Solicitation
Posted: Dec 16, 2025
View
OFFICE TRAILER | GovScope