OLYM REPAIR ONPVC SEWER
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for the repair of an ONPVC sewer line at the Olympic National Park Visitor Center in Washington. This is a Total Small Business Set-Aside with an estimated value between $25,000 and $100,000. The project aims to correct issues causing sewage backup. Quotes are due April 20, 2026, at 1:00 PM local time.
Opportunity Details
- Solicitation Number: 140P8326Q0022
- Agency: Department of the Interior, National Park Service (NPS), PWR OLYM MABO
- Contract Type: Firm-Fixed-Price construction contract
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- NAICS: 237110 (Heavy and Civil Engineering Construction) with a $45 million size standard
- Estimated Value: $25,000 - $100,000
- Product Service Code: Z2ND (Repair Or Alteration Of Sewage And Waste Facilities)
Scope of Work
The project involves the repair and restoration of a sanitary sewer service lateral connecting the Olympic National Park Visitor Center comfort station to a main manhole. The primary objective is to address issues like settlement, deficient backfill, and improper invert channel construction. Key tasks include:
- Replacement of approximately 10 linear feet of 4-inch PVC SDR-35 sewer pipe (Base Bid).
- An optional additional 10 linear feet of pipe replacement and concrete restoration, if required by field conditions.
- Traffic control, excavation, installation of trench protective systems, manhole channel and bench reconstruction, backfilling, and restoration of asphalt pavement, concrete curb, and sidewalk.
- Compliance with specific performance standards, including a minimum 2.0% gravity slope for the new pipe and 95% Modified Proctor compaction for backfill.
- Adherence to detailed technical specifications for materials and installation procedures.
Period & Place of Performance
- Location: Olympic National Park Visitor Center area, Port Angeles, Washington.
- Period of Performance: 21 calendar days from the Notice to Proceed.
- Mobilization: Within 7 calendar days of receiving the Notice to Proceed.
Submission Requirements & Evaluation
Bidders must submit a comprehensive quote package, including:
- A Price Schedule for both base and option items.
- Business Information, Proposed Team details, and Relevant Experience & Past Performance for the prime and any subcontractors.
- A detailed Technical Approach demonstrating understanding of requirements, staffing, schedule, phasing, and equipment.
- Completed Representations & Certifications, including those related to telecommunications equipment (FAR 52.204-24 and 52.204-26).
- Bidders must comply with Department of Labor prevailing wage rates (GDN WA20260022) for Clallam County, Washington.
- Liability Insurance is REQUIRED; Bid, Performance, and Payment Bonds are NOT REQUIRED.
- Offerors must have a current SAM.gov registration.
Key Dates & Contact
- Quotes Due: April 20, 2026, at 1:00 PM local time.
- Submission Method: Email to sue_mayo@nps.gov. Hard copies will not be accepted.
- Site Visit: Not planned, but can be arranged by contacting Kurt McGowan (Kurtis_McGowan@nps.gov) by April 3, 2026, 2:00 PM PDT.
- Primary Contact: Sue Mayo, Sue_Mayo@nps.gov.
- Monitoring: Bidders are responsible for monitoring SAM.gov for any amendments or updates.