Z--OLYM REPAIR ONPVC SEWER

SOL #: 140P8326Q0022Solicitation

Overview

Buyer

Interior
National Park Service
PWR OLYM MABO(83000)
PORT ANGELES, WA, 98362, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Sewage And Waste Facilities (Z2ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 20, 2026
2
Last Updated
Apr 9, 2026
3
Submission Deadline
Apr 20, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), through its PWR OLYM MABO office, is soliciting quotes for ONPVC Sewer Line Repair at the Olympic National Park Visitor Center area. This Total Small Business Set-Aside opportunity (Solicitation 140P8326Q0022) aims to address issues causing sewage backup by repairing a sanitary sewer service lateral. Quotes are due by April 20, 2026, at 1:00 PM local time.

Scope of Work

The project involves the repair and restoration of a sanitary sewer service lateral connecting the Visitor Center comfort station to Sanitary Sewer Manhole SS MH-01. The primary objective is to correct issues such as settlement, deficient backfill, and improper invert channel construction.

  • Base Bid: Replacement of approximately 10 linear feet of 4-inch PVC SDR-35 sewer pipe.
  • Contract Option 1: An additional 10 linear feet of sewer pipe replacement and concrete restoration, to be authorized if field measurements indicate the Base Bid limits are insufficient.
  • Key Tasks: Include traffic control, excavation, removal of existing damaged pipe, installation of new PVC pipe with elastomeric gasket joints, installation of a resilient pipe connector at the manhole wall, and reconstruction of the manhole channel and bench. The existing manhole structure does not require full replacement; work focuses on improving alignment and flow.
  • Restoration: Backfilling and compaction of the trench, restoration of asphalt pavement, concrete curb, and sidewalk to match existing conditions, and protection/reinstallation of tracer wire.
  • Technical Standards: Work must adhere to a minimum gravity slope of 2.0 percent for the new pipe and trench backfill compacted to 95% Modified Proctor, complying with various ASTM, ACI, OSHA, and WSDOT standards.

Contract Details & Timeline

  • Contract Type: Single Firm-Fixed-Price construction contract.
  • Estimated Value: Between $25,000 and $100,000.
  • Set-Aside: 100% Total Small Business Set-Aside under NAICS code 237110 (size standard $45 million).
  • Period of Performance: Work is to be completed within 21 calendar days from the Notice to Proceed, with mobilization within 7 calendar days. The overall contract period is from April 27, 2026, to May 26, 2026.
  • Wage Requirements: Subject to Construction Wage Rate Requirements (FAR Part 22.4), with prevailing wage rates detailed in Attachment 3.

Submission & Evaluation

  • Quote Due Date: April 20, 2026, at 1:00 PM local time.
  • Submission Method: Quotes must be submitted via email to sue_mayo@nps.gov. Hard copies will not be accepted.
  • Required Documents: Offerors must complete and return forms outlined in "Attachment 5: Forms to Return with Quote," including a Price Schedule (lump sum for base and option items), Business Information, Proposed Team details, Relevant Experience & Past Performance (up to three projects for prime and subcontractors), and a Technical Approach demonstrating understanding and capability.
  • Amendment Acknowledgment: Offerors must acknowledge Amendment 0001 by completing and signing boxes 15A-15C of the amendment and returning it with their quote.
  • Eligibility: A current (not pending or expired) SAM.gov registration is mandatory for award eligibility.
  • Bonds & Insurance: Bid, performance, and payment bonds are NOT REQUIRED. However, Liability Insurance IS REQUIRED.
  • Site Visit: No pre-arranged site visit is planned. Interested parties may arrange individual visits by contacting Kurt McGowan (Kurtis_McGowan@nps.gov) by April 3, 2026, 2 PM PDT.

Key Clarifications & Notes

Amendment 0001 added "Attachment 9 Q&A 140P8326Q0022," which clarifies that the existing manhole structure does not need to be replaced; the scope includes reconstruction of the manhole channel and bench as part of the base bid. Bidders should review all attachments, including "As-Built Drawings" and "ONPVC Sewer Photos," to understand existing conditions. Offerors are responsible for monitoring SAM.gov for any further amendments. Contact: Sue Mayo at Sue_Mayo@nps.gov.

People

Points of Contact

Mayo, SuePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Solicitation
Posted: Apr 9, 2026
Version 1
Solicitation
Posted: Mar 20, 2026
View