Open, Inspect, Report of PUMPS, CENTRIFUGAL
SOL #: 70Z08526Q49007B00Combined Synopsis/Solicitation
Overview
Buyer
Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 2(00085)
ALAMEDA, CA, 94501, United States
Place of Performance
Place of performance not available
NAICS
Ship Building and Repairing (336611)
PSC
Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment (J020)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Mar 27, 2026
2
Submission Deadline
Apr 10, 2026, 3:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The United States Coast Guard Surface Forces Logistics Center (SFLC) is seeking quotations for the Open, Inspect, Report, and possible Overhaul of six (6) Centrifugal Pumps (NSN: 4320-01-458-0798, PN: 3000DH 2X1-1/2F.F.FL 5HP) manufactured by R.S. Corcoran Co. This is a Total Small Business Set-Aside combined synopsis/solicitation (RFQ) under NAICS 336611. Quotes are due April 10, 2026, by 11:00 AM EST.
Scope of Work
The requirement involves comprehensive overhaul services for six centrifugal pump units, including both the pump and motor, for SFLC stock replenishment. Key tasks include:
- Preliminary Disassembly & Inspection: To determine estimated overhaul costs, including material, labor, testing, packing, marking, and preservation.
- Replacement Parts: All replacement parts must be new original OEM parts; reclaimed, recycled, or aftermarket parts are not acceptable.
- Label Plates: Removal and replacement with new plates detailing pump/motor specifications, contractor name, contract number, and overhaul date.
- Mechanical Seal Conversion: Conversion of pumps with packing glands to mechanical seal assemblies.
- Paint Application: Removal of existing paint and application of primer and a finish coat (SAE AMS-STD-595 Color Number 17043 (Gold)) according to SFLC standards.
- Motor Reconditioning: Drive motors must be reconditioned to a like-new state, including mandatory replacement of bearings, seals, and gaskets, with potential baking and re-dipping of windings.
Performance Standards & Deliverables
- Testing: Conduct Rotational, Operational (minimum 10 minutes, +/- 5% flow tolerance), and Hydrostatic (40 PSIG for 15 minutes) tests, all witnessed by a Coast Guard Quality Assurance Representative (QAR).
- Test Reports: Detailed test reports are required for each pump unit.
- Quality Assurance: Contractors must maintain a documented Quality Control (QC) Program conforming to ANSI/ASQ Q9001-2008 and notify the Contracting Officer 10 days prior to QA inspections or testing.
- Packaging & Marking: Overhauled units must be preserved for warehouse storage, individually packaged in wooden boxes, and marked with specific requirements, including bar coding.
- Warranty: The contractor's standard new pump unit warranty applies.
Contract Details
- Type: Combined Synopsis/Solicitation (RFQ) for commercial items, Firm Fixed-Price.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5) under NAICS 336611.
- Award Basis: Award will be made to the lowest-priced, technically acceptable offeror. Multiple awards will not be made; vendors must provide an all-or-nothing quote.
- Delivery: F.O.B. Destination to USCG (SFLC), Receiving Room, Bldg. #88, 2401 Hawkins Point Road, Baltimore, MD 21226. Shipping costs must be included in the repair price.
- Payment: Electronic submission of payment requests via the Invoice Processing Platform (IPP).
- Applicable Regulations: FAR Subpart 12.6, FAR 52.212-1, 52.212-4, 52.212-5, HSAR 3052.212-70, and HSAR 3052.247-72.
Submission Requirements & Deadline
- Registration: Offerors must be registered in SAM.gov.
- Certifications: Include a completed FAR 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services.
- Quote Submission: Quotes are due by April 10, 2026, at 11:00 AM EST and must be emailed to chad.a.ball@uscg.mil.
People
Points of Contact
Chad BallPRIMARY
Files
Files
Versions
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 27, 2026