OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements

SOL #: 69056723R000010Pre-Solicitation

Overview

Buyer

Transportation
Federal Highway Administration
690567 WESTERN FEDERAL LANDS DIV
VANCOUVER, WA, 98661, United States

Place of Performance

Crater Lake, OR

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

No set aside specified

Timeline

1
Posted
Sep 16, 2024
2
Last Updated
Sep 16, 2024

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Highway Administration (FHWA), Western Federal Lands Division, is preparing a Presolicitation for the OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements project at Crater Lake National Park, Klamath County, Oregon. This project involves extensive rehabilitation and construction, with an estimated value between $30,000,000 and $40,000,000. The solicitation, under Full and Open Competition (Unrestricted Basis), is anticipated for Winter 2024/2025.

Scope of Work

The project encompasses comprehensive improvements over 1.026 miles, including:

  • Trail Rehabilitation: Reconstruction of the entire 1.1-mile Cleetwood Trail, including aggregate base, slope stabilization, and retaining walls.
  • Rockfall Mitigation: Scaling and protection measures in high-risk zones, utilizing anchored wire mesh, draped rockfall protection, rock bolts, and shotcrete.
  • Marina Reconstruction: Removal and replacement of the existing bulkhead/dock with a structurally stable marina, featuring a floating dock system and a new fixed pier structure with micropiles.
  • Facility Upgrades: Replacement of outdated composting toilets and the temporary concessionaire booth with permanent structures.
  • Wall Construction: Building various types of walls, including Dry Stack Rockery, Soil Nail, Gabion, Mechanically Stabilized Earth Walls, and Stone Masonry.

Contract & Timeline

  • Opportunity Type: Presolicitation
  • Contract Type: Negotiated, Firm-Fixed-Price (Base and 4 options)
  • Estimated Price Range: $30,000,000 - $40,000,000
  • Tentative Completion: Fall 2027
  • Set-Aside: Full and Open Competition (Unrestricted Basis)
  • Solicitation Release: Anticipated Winter 2024/2025 (Solicitation Number: 69056723R000010)
  • Published Date: September 16, 2024

Key Documents & Actions

Preliminary plans and a project description are available under "Attachments" on SAM.gov. These documents detail the project scope, technical specifications for slope stabilization, rockfall protection, and various construction elements. A recent Q&A clarified that the government will not provide the project engineer's information. Interested vendors are encouraged to:

  • Review the preliminary plans thoroughly for detailed design and scope.
  • Consider visiting the site before snow limits access (after October 30, 2024, access is weather-dependent).
  • Arrange for noxious weed inspection for aggregate sources, as required.
  • Follow the opportunity on SAM.gov to receive notifications when the solicitation documents are posted.

Contact Information

People

Points of Contact

Contracts G. OfficePRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Pre-Solicitation
Posted: Sep 16, 2024
Version 1
Pre-Solicitation
Posted: Sep 16, 2024
View
OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements | GovScope