Overhaul of F-16 Check Valve

SOL #: FA811826R0034Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8118 AFSC PZABB
TINKER AFB, OK, 73145-3303, United States

Place of Performance

S Coffeyville, OK

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Valves (J048)

Set Aside

No set aside specified

Timeline

1
Posted
May 29, 2026
2
Submission Deadline
Jun 29, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for a 5-year Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the overhaul of F-16 Check Valves (NSN: 4820-01-053-3375RK, P/N: 2750037-101). This acquisition is a Small Business Set-Aside. Proposals are due June 29, 2026, at 2:00 PM local time.

Scope of Work

The contractor will be responsible for furnishing all material, plant facilities, labor, parts, equipment, and expertise to remanufacture F-16 Check Valves to a like-new condition. This includes disassembly, cleaning, inspection, rehabilitation, re-assembly, testing, and finishing, all in accordance with specified technical orders. The work will be performed at the contractor's facility.

Contract Details

  • Contract Type: Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity (IDIQ)
  • Period of Performance: One 5-year period
  • Set-Aside: Small Business Set-Aside
  • Product Service Code: J048 (Maintenance, Repair And Rebuilding Of Equipment: Valves)
  • Place of Performance: Contractor's facility

Key Requirements & Deliverables

  • Overhaul: Remanufacture F-16 Check Valves to like-new condition, adhering to technical orders.
  • Packaging: Accomplish all necessary packing, preservation, and packaging, including specialized instructions for items with residual fuel (hazardous materials) and compliance with Wood Packaging Material (WPM) regulations.
  • Identification: Implement Item Unique Identification (IUID) marking.
  • Order Quantities: Minimum order quantity of 5 each; Maximum order quantity of 20 each for Line Item 0001.
  • Contractor Responsibilities: Establish and maintain a quality program, parts control program, and updated Technical Orders. Develop and implement a cybersecurity protection plan and a Production Surge Plan. Contractor is responsible for furnishing all material, support equipment, and special tools; Government Furnished Equipment (GFE) will not be provided.
  • Data Deliverables (CDRLs): Include Commercial Asset Visibility (CAV) Reporting, Contract Depot Maintenance (CDM) Monthly Production Reports, Annual Government Property Physical Inventory Reports, Technical Data Packages (TDP), Reports of Shipping Discrepancy (SF-364), and Production Surge Plans.

Submission & Evaluation

  • Proposal Due Date: June 29, 2026, 2:00 PM local time.
  • Submission Method: Electronically via the PIEE Solicitation Module.
  • Evaluation Criteria: Proposals will be evaluated based on price as the sole factor, with the award going to the offeror with the lowest total evaluated price (TEP) that conforms to all solicitation requirements.
  • Eligibility: Offerors must provide evidence of qualification per RFO 52.209-1. Non-qualified vendors must submit a Source Approval Request (SAR) package. A Pre-Award Survey (PAS) and/or Initial Production Evaluation (IPE) is required.

Important Notes

Funds are not presently available for this contract; obligation is contingent upon availability. Bidders must review transportation data (DD Form 1653) for F.O.B. terms and DCMA coordination.

People

Points of Contact

Morgan McgaritySECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 29, 2026
Overhaul of F-16 Check Valve | GovScope