Overhaul of the UH-60 POWER TURBINE MODULE

SOL #: W58RGZ-26-B-0012Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6QK ACC-RSA
REDSTONE ARSENAL, AL, 35898-0000, United States

Place of Performance

Redstone Arsenal, AL

NAICS

Aircraft Engine and Engine Parts Manufacturing (336412)

PSC

Gas Turbines And Jet Engines, Aircraft, Prime Moving; And Components (2840)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 26, 2026
2
Submission Deadline
Mar 6, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is soliciting bids for the overhaul of the UH-60 POWER TURBINE MODULE (NSN 2840-01-503-1700 to 2840-01-692-2620). This will be a Five-year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract with an estimated quantity range of 25 to 390 units, including 65 for Foreign Military Sales (FMS). This is a limited competitive procurement utilizing FAR Part 14 (sealed bidding), restricted to System Readiness Directorate (SRD) approved sources. Bids are due by March 6, 2026.

Scope of Work

The contractor will furnish all services, labor, parts, materials, and equipment necessary to accomplish the overhaul of the POWER TURBINE MODULE. This item is a Critical Safety Item (CSI), requiring strict adherence to quality control provisions, including AMCOM Regulation 702-7, QE-STD-1, and QE-STD-2. A Product Verification Audit (PVA) for three units is mandatory, with failure potentially leading to contract termination. Required delivery is FOB Origin.

Key Requirements & Constraints

  • Approved Sources: Overhaul can only be performed by SRD-approved sources, currently including GE Engine Services Inc., Bet Shemesh Engines LTD., GE Engine Services LLC, and Standard Aero Limited.
  • Source Approval Request (SAR): Companies not currently approved must submit a SAR through the SRD website (avmc.army.mil/Directorates/SRD/TechDataMgmt/) to be considered.
  • Government Furnished Property (GFP): Bidders must account for GFP, detailed in Attachment 0005, and comply with Total Asset Visibility – Contractor (TAV-C) requirements for GFM/GFE/GFP, including specific DLMS transactions and portal access/training (Attachment 0001).
  • Documentation & Reporting: Compliance with various Contract Data Requirements Lists (CDRLs) is required, including Government Property Inventory Reports (A001), Shipping Discrepancy Reports (A002), Technical Reports for M&O Process Plans (A003), and Logistics Product Data for TAMMS-A (A004).
  • Packaging: Specific packaging requirements for the MODULE ASSY, POWER TURBINE (NSN 2840-01-692-2620) are outlined in Attachment 0007, referencing MIL-STD-129 and MIL-STD-2073-1.

Contract Details

  • Type: Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ).
  • Duration: Five (5) year contract.
  • Quantities: Minimum 25 each, Maximum 390 each (includes 65 FMS).
  • Procurement Method: Limited competitive, sealed bidding (FAR Part 14).
  • Funding: The requirement is currently unfunded; award is contingent upon receipt of sufficient funds.

Submission & Evaluation

  • Proposal Submission: Proposals must be submitted via email only to reginald.c.burrell2.civ@army.mil. No fax or hard copy responses will be accepted.
  • Closing Date: March 6, 2026 (estimated, subject to adjustment).
  • Evaluation: Award will be made to the responsible bidder whose bid is most advantageous to the Government, considering only price and price-related factors. Bids will be accepted for 120 days.

Additional Notes

Access to technical data requires a current DD Form 2345, Military Critical Technical Data Agreement.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Jan 26, 2026
Overhaul of the UH-60 POWER TURBINE MODULE | GovScope