Oxford EBSD and EDS Maintenance Visit

SOL #: FA812626Q0022_20FEB26Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8126 AFSC PZIMB
TINKER AFB, OK, 73145-3305, United States

Place of Performance

S Coffeyville, OK

NAICS

Testing Laboratories and Services (541380)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Instruments And Laboratory Equipment (J066)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 20, 2026
2
Submission Deadline
Mar 4, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force, AFSC PZIMB, is seeking quotes for a one-time repair and Pre-Contract Inspection (PCI) of Oxford Electron Backscatter Detector (EBSD) and Energy Dispersive Spectroscopy (EDS) equipment. This is a Combined Synopsis/Solicitation (RFQ) issued under Full and Open Competition for a Firm-Fixed-Price contract. The work will be performed at Tinker AFB, Oklahoma City-Air Logistics Complex (OC-ALC). Quotes are due by March 4, 2026, at 3:00 PM CST.

Scope of Work

The contractor shall provide all labor, tools, equipment, test equipment, materials, OEM parts, quality control, and transportation for the required services.

  • One-time repair of an Oxford EBSD (Symmetry S2, SN: 051J028853, Hardware EBSD 3061b0), specifically requiring the replacement of diodes and the cover plate.
  • Pre-Contract Inspection (PCI) on an Oxford EDS (Ultim Max 170, SN: 051S005191, Hardware EDS 306f7c) and its Aztec acquisition software. All services and parts must conform to manufacturer specifications.

Performance Standards

  • Provide a written Estimate Repair Report within one business day after inspection.
  • Submit a draft PCI Report to the SME immediately upon completion of maintenance.
  • Deliver a final PCI report within five business days.
  • Respond to any Corrective Action Report (CAR) or Customer Complaint in writing within two business days.

Contract & Timeline

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: April 15, 2026 - February 15, 2027
  • Set-Aside: Full and Open Competition
  • Quotes Due: March 4, 2026, 3:00 PM CST
  • Published Date: February 20, 2026
  • Place of Performance: Tinker AFB, Oklahoma City-Air Logistics Complex (OC-ALC)

Evaluation & Eligibility

Award will be made to the technically acceptable vendor with the lowest evaluated price, in accordance with FAR Part 12 (Commercial Items) and FAR Part 13 (Simplified Acquisition Procedures). Vendors must be registered in the System for Award Management (SAM) database to be eligible for award.

Special Requirements

Contractors must comply with all applicable federal, state, and local laws, regulations, and instructions, including those related to environmental protection, occupational safety and health, and the Service Contract Act wage determinations for Oklahoma counties. Specific training requirements include FOD/DOP Awareness, Fire Safety, Environmental Accountability, Human Factors, and ISO 50001 Energy Management. Insurance requirements (Workers' Compensation, Employer's Liability, General Liability, and Automobile Liability) are detailed. Payment requests and receiving reports must be submitted electronically via Wide Area WorkFlow (WAWF).

Contact Information

People

Points of Contact

Brian EakersPRIMARY
Claude J. Boggs, Jr.SECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Feb 20, 2026
Oxford EBSD and EDS Maintenance Visit | GovScope