P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA

SOL #: N6247324R5227Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM SOUTHWEST
SAN DIEGO, CA, 92132-0001, United States

Place of Performance

Twentynine Palms, CA

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 23, 2024
2
Last Updated
Sep 12, 2025
3
Submission Deadline
May 15, 2025, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 10MW/40MWh (6.0MW/24MWh at cogeneration site 1 and 4.0MW/16MWh at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the
BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 30
Solicitation
Posted: Sep 12, 2025
View
Version 29
Solicitation
Posted: Aug 21, 2025
View
Version 28
Solicitation
Posted: Aug 14, 2025
View
Version 27
Solicitation
Posted: Aug 14, 2025
View
Version 26
Solicitation
Posted: Aug 13, 2025
View
Version 25
Solicitation
Posted: Aug 6, 2025
View
Version 24
Solicitation
Posted: Jul 31, 2025
View
Version 23
Solicitation
Posted: Jul 21, 2025
View
Version 22
Solicitation
Posted: Jul 15, 2025
View
Version 21
Solicitation
Posted: Jul 2, 2025
View
Version 20
Solicitation
Posted: Jul 1, 2025
View
Version 19
Solicitation
Posted: Jun 30, 2025
View
Version 18
Solicitation
Posted: Jun 24, 2025
View
Version 17
Solicitation
Posted: Jun 5, 2025
View
Version 16
Solicitation
Posted: Jun 4, 2025
View
Version 15
Solicitation
Posted: May 29, 2025
View
Version 14
Solicitation
Posted: May 20, 2025
View
Version 13
Solicitation
Posted: May 20, 2025
View
Version 12
Solicitation
Posted: May 19, 2025
View
Version 11
Solicitation
Posted: May 8, 2025
View
Version 10
Solicitation
Posted: Apr 17, 2025
View
Version 9
Solicitation
Posted: Apr 2, 2025
View
Version 8Viewing
Solicitation
Posted: Apr 1, 2025
Version 7
Solicitation
Posted: Mar 27, 2025
View
Version 6
Solicitation
Posted: Jan 29, 2025
View
Version 5
Solicitation
Posted: Jan 17, 2025
View
Version 4
Solicitation
Posted: Sep 20, 2024
View
Version 3
Solicitation
Posted: May 17, 2024
View
Version 2
Solicitation
Posted: May 2, 2024
View
Version 1
Solicitation
Posted: Apr 23, 2024
View