P-1241 Low Altitude Radio Communication System (LARCS) Communication Towers Contract for Marine Air Ground Task Force Training Command (MAGTFTC), Twentynine Palms, CA
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVFACSYSCOM SOUTHWEST, is managing a Firm-Fixed-Price (FFP) Design-Build (DB) contract for the P-1241 Low Altitude Radio Communication System (LARCS) Communication Towers project at Marine Air Ground Task Force Training Command (MAGTFTC), Twentynine Palms, CA. This opportunity involves the design, construction, and modernization of communication towers in remote, helicopter-accessible locations. The current phase requests Final Proposal Revisions (FPRs) from Phase Two Offerors ONLY, due by February 18, 2026.
Scope of Work
This project entails the design and construction of new communication towers and the restoration/modernization of existing ones across remote mountaintops or hilltops within MAGTFTC Twentynine Palms. Most work sites lack utilities, requiring the contractor to provide necessary infrastructure. The scope includes 11 base items and 2 option items, covering demolition, site preparation, infrastructure installation, and compliance with safety and environmental regulations. Helicopter services are essential for accessing these remote sites, and the contractor is responsible for providing heavy lift helicopter support. Coordination with multiple Government/Department of Defense (DOD) commands, including NAVSEA, is required for collateral and Government Furnished Equipment (GFE) installation.
Contract Details
- Contract Type: Firm-Fixed-Price (FFP) Design-Build (DB)
- Construction Cost Limitation (CCL): $41,000,000 for Base Items 0001-0011.
- Period of Performance: 1,460 calendar days (approximately 4 years) from contract award.
- Set-Aside: Unrestricted Full and Open Competition, with price evaluation preference for HUBZone Small Business concerns.
- NAICS Code: 237130 (Construction Of Electronic And Communications Facilities)
- Small Business Size Standard: $45,000,000
- Project Labor Agreement (PLA): Required, as this is a large-scale construction project exceeding $35M. Offerors must submit a PLA with their offer.
Submission & Evaluation
This is a Phase Two solicitation. Discussions with Phase Two Offerors have closed, and Final Proposal Revisions (FPRs) are now requested.
- FPR Due Date: February 18, 2026, at 2:00 PM PT.
- Submission: Electronically via DoD SAFE.
- Evaluation Factors: Technical Solution, Small Business Utilization and Participation, and Price. Technical factors and past performance are more important than price.
- Technical Solution: Narrative page limit increased to 7 single-sided pages. Figures, tables, drawings, and pictures are excluded from this limit and must be submitted as an appendix (up to 20 pages).
- Small Business Utilization: Minimum 17% small business participation is required, rated Acceptable/Unacceptable. Offerors must submit Exhibit "F" (Historical Utilization) and Exhibit "G" (Commitment Document).
- Experience: Construction experience project value threshold lowered to $2,000,000. Projects must be 100% complete within the past 10 years.
- Wage Determination: The latest applicable wage determination is CA20260026, Modification 02, dated 01/23/26.
Key Amendments & Notes
Offerors must acknowledge receipt of all amendments on the offer schedule. Daily radio communication with Bearmat Range Control is required for site access, and overnight encampment on ranges is prohibited. The project may experience up to three interruptions (1-3 days each) during site work phases due to live fire training or other conditions.
Contacts
- Primary: Lauren Steigerwald (lauren.e.steigerwald.civ@us.navy.mil)
- Secondary: Victor Mariscal (victor.m.mariscal.civ@us.navy.mil)