P1360 Joint Maritime Facility, Newfoundland, Canada

SOL #: N6247026R0011Pre-Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM ATLANTIC
NORFOLK, VA, 23508-1278, United States

Place of Performance

Argentia, CA-NL, Canada

NAICS

Industrial Building Construction (236210)

PSC

Construction Of Other Industrial Buildings (Y1EZ)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 2, 2025
2
Last Updated
Apr 17, 2026
3
Response Deadline
Dec 22, 2025, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy, NAVFACSYSCOM ATLANTIC, is soliciting proposals for the P1360 Joint Maritime Facility project in Argentia, Newfoundland, Canada. This opportunity involves the design-bid-build construction of a new low-rise communication facility and the demolition of two existing buildings. This is an unrestricted, full and open competitive procurement. Proposals are due by May 4, 2026, at 2:00 PM Norfolk, VA local time.

Scope of Work

The project encompasses the construction of a new Joint Maritime Facility designed to house administration, support, maintenance, storage, communication equipment, and logistics functions. Key features include provisions for emergency power resiliency (generators, UPS) and a secure vault for communication systems. Associated site features such as paving, utilities (electrical, mechanical, telecommunications), and demolition are also included. The scope specifically requires the demolition of the existing Terminal Equipment Building (4,645 m2) and Generator Building (576 m2). Bidders must account for the presence of hazardous materials, including lead, mercury, and PCBs in paint, and asbestos-containing materials (ACM) in the existing structures, requiring proper abatement and disposal.

Contract & Timeline

  • Contract Type: Firm Fixed Price (Design-Bid-Build)
  • Period of Performance: Approximately 550 calendar days after Notice to Proceed.
  • Magnitude of Construction: Estimated between $25,000,000 and $100,000,000.
  • Set-Aside: Unrestricted, full and open competitive procurement.
  • NAICS Code: 236210 (Construction Of Other Industrial Buildings), Size Standard: $45M.
  • Proposal Due Date: May 4, 2026, 2:00 PM Norfolk, VA local time.
  • Published Date: April 17, 2026.
  • Liquidated Damages: $20,000 per calendar day for delays.

Evaluation

Award will be based on a best value tradeoff process. Evaluation factors include Construction Experience, Technical Solution, Safety (Acceptable/Unacceptable), Past Performance, and Price. Technical factors and past performance are considered approximately equal in importance to each other and to price. Offerors must be registered in SAM.gov.

Key Attachments & Notes

The solicitation includes numerous attachments detailing specifications and drawings (Parts 1-5 for SPECS, Parts 1-12 for DWG), hazardous materials reports, and required forms such as the Construction Experience Project Data Sheet, Past Performance Questionnaire, and Price Proposal Form (Schedule B). Several amendments (0001-0005) have been issued, primarily extending the proposal due date, clarifying technical requirements (e.g., wood blocking, CRAC/CRAH units), revising drawings, and addressing pre-proposal inquiries. All proposals must be submitted electronically via the PIEE Solicitation Module, with only one copy required.

People

Points of Contact

Files

Files

Download

Versions

Version 9
Solicitation
Posted: Apr 17, 2026
View
Version 8
Solicitation
Posted: Apr 17, 2026
View
Version 7
Solicitation
Posted: Apr 9, 2026
View
Version 6
Solicitation
Posted: Apr 8, 2026
View
Version 5
Solicitation
Posted: Apr 1, 2026
View
Version 4
Solicitation
Posted: Apr 1, 2026
View
Version 3
Solicitation
Posted: Feb 2, 2026
View
Version 2
Solicitation
Posted: Feb 2, 2026
View
Version 1Viewing
Pre-Solicitation
Posted: Dec 2, 2025