Pacific Instruments DAS Hardware
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Aeronautics and Space Administration (NASA) Information Technology Procurement Office (ITPO) has issued a Limited-Sources Justification (LSJ) for the procurement of Pacific Instruments DAS Hardware. This acquisition aims to expand the existing Enhanced Digital Access Communications System (EDACS) architecture at NASA Stennis Space Center's E Complex E1 Test Stand in Stennis Space Center, MS. This justification explains the intent to procure from a single source, Pacific Instruments, Inc.
Purpose & Scope
This LSJ details NASA's intent to acquire Pacific Instruments 6000 Series Data Acquisition System (DAS) hardware. The hardware is crucial for expanding the EDACS architecture at the E1 Test Stand, ensuring continuity and compatibility with currently deployed systems. The justification highlights the need for identical hardware to maintain configuration, performance, and safety standards within the critical test environment.
Justification Details
NASA ITPO justifies this sole-source procurement from Pacific Instruments, Inc., under GSA Federal Supply Schedule (FSS) GS-07F-038CA. Pacific Instruments is identified as the original equipment manufacturer (OEM), and their products are proprietary with no authorized resellers. The justification emphasizes that substituting this hardware would introduce significant technical and programmatic risks, including potential integration failures, compromised data accuracy, and delays in critical operations. The decision is based on FAR 8.401(b)/GSAM 538.7104-3(b)(ii) and (iv), citing the unique and specialized nature of the required products and the imperative to maintain compatibility with the existing integrated system. Estimated price and lead-time information are mentioned but redacted in the document.
Contract & Timeline
- Type: Limited-Sources Justification (LSJ)
- Published: June 12, 2026
- Set-Aside: Not applicable for this justification
Place of Performance
- Stennis Space Center, MS, United States
Contact Information
- Primary Contact: Kimberly Sandoz (kimberly.r.sandoz@nasa.gov)