PACKING,PREFORMED
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP WEAPON SYSTEMS SUPPORT MECH, is soliciting proposals for the procurement of PACKING,PREFORMED. This opportunity is a Total Small Business Set-Aside and requires manufacturing to specific technical drawings and standards. Proposals are due by April 17, 2026.
Scope of Work
This solicitation covers the manufacture of PACKING,PREFORMED items. Key requirements include:
- Manufacturing & Design: Items must meet material and physical requirements specified, including NAVSEA P/N: 2722497-1 (CAGE CODE 10001) or the acceptable alternate PARKER P/N: E0540-80 (CAGE CODE 02697). All materials must adhere to specifications and regulations within Drawing 2722497.REV_A.
- Marking: Items must be marked in accordance with applicable Military Standards such as MIL-STD-130, MIL-STD-1285, and MIL-STD-454, depending on the part type. Shelf-life items require specific date markings (manufactured, cured, assembled, packed, expiration) per MIL STD 129, MIL-STD-130, MIL STD 290, or FED STD 123.
- Configuration Control: MIL-STD-973, Paragraph 5.4.8, Configuration Control (Short Form Procedure), is incorporated. Contractors must submit Engineering Change Proposals, Requests for Deviations, and Requests for Waivers as per MIL-STD-973.
- Shelf Life: Items must have not less than 85 percent shelf-life remaining at the time of receipt by the first Government activity, as mandated by DOD 4140.27-M. Specific marking requirements for Type I and Type II shelf-life items apply.
- Quality Assurance: The contractor is responsible for performing all inspection requirements and ensuring compliance with all contract requirements. Records of inspection work must be kept for 365 days after final delivery.
- Packaging: Preservation, packaging, packing, and marking must be in accordance with MIL-STD 2073.
- Commercial Brand Name Description: If proposing an alternate item, a complete technical description must be submitted for government review.
Contract & Timeline
- Type: Solicitation (likely Firm Fixed-Price based on clauses)
- Set-Aside: Total Small Business Set-Aside
- Response Due: April 17, 2026, 8:30 PM EDT
- Published: March 18, 2026
- FOB: Destination
- Payment: Wide Area Workflow (WAWF) instructions apply.
Additional Notes
Drawings can be viewed on SAM.gov by searching the solicitation number. All contractual documents are considered "issued" when transmitted by mail, facsimile, or other electrocommerce methods. This is not an FMS Requirement. Contractor is liable for all shipping expenses to DODAAC locations.