Pago Pago TSA Space Renovation, American Samoa

SOL #: 47PK0726R0001Solicitation

Overview

Buyer

General Services Administration
Public Buildings Service
PBS PROJECT DELIVERY WEST - BRANCH D
Washington, DC, 20405, United States

Place of Performance

Pago Pago, AS

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Office Buildings (Z2AA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Oct 9, 2025
2
Last Updated
Feb 11, 2026
3
Submission Deadline
Feb 26, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The General Services Administration (GSA), Public Buildings Service, is soliciting proposals for the Pago Pago TSA Space Renovation project at the Pago Pago International Airport in American Samoa. This project involves interior improvements to approximately 1,680 square feet of TSA office space located in Tafuna Village. This procurement is a Total Small Business Set-Aside.

Scope of Work

The contractor shall provide all labor, materials, and equipment to renovate the existing TSA space. Key requirements include:

  • Flooring: Replacing existing carpet and cove base throughout the space.
  • Kitchenette: Installing a new kitchen cabinet system, including a solid surface counter, sink, garbage disposal, and tankless water heater per provided elevation designs.
  • Finishes: Painting the entire office space and replacing damaged or discolored ceiling tiles.
  • Logistics: Relocating existing agency furniture (excluding sensitive IT equipment like computers).
  • Phasing: Work must be performed in phases—starting with the Break room and then the Training room—to accommodate ongoing operations, as no temporary relocation space is available.

Contract & Timeline

  • Set-Aside: Total Small Business (FAR 19.5)
  • Proposal Submission Window: Proposals will only be accepted between February 23, 2026, and February 25, 2026, at 4:00 PM PT.
  • Construction Schedule: Work is anticipated to begin in April 2026. Construction hours are restricted by airline schedules: M/W/F 14:30–23:00 and T/Th 07:30–16:00.
  • Place of Performance: Pago Pago International Airport, American Samoa.

Submission Requirements

Bidders must use the GSA Standard Bid Breakdown Form to itemize costs across construction divisions, including materials, labor, overhead, and profit. Proposals must be submitted electronically to Kasey Wilkie (kasey.wilkie@gsa.gov). Note that access to certain controlled documents requires a GSA Affiliated Customer Account (GACA).

Additional Notes

Amendment 0005 is the latest update, extending the due date and providing final RFI responses. Key clarifications confirm that existing doors and frames are to remain and that the site visit (held January 13, 2026) was not mandatory for responsiveness.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Feb 11, 2026
View
Version 6Viewing
Solicitation
Posted: Feb 11, 2026
Version 5
Solicitation
Posted: Dec 15, 2025
View
Version 4
Solicitation
Posted: Nov 25, 2025
View
Version 3
Solicitation
Posted: Oct 29, 2025
View
Version 2
Solicitation
Posted: Oct 14, 2025
View
Version 1
Solicitation
Posted: Oct 9, 2025
View