PANEL ASSY, TOP
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, has issued a solicitation for the procurement of PANEL ASSY, TOP, with Part Number 900-51170, manufactured by L3HARRIS MARITIME POWER (04801). This is a requirement for a specific panel assembly. Quotations are due by March 23, 2026.
Scope of Work
This opportunity requires the manufacture and supply of a specific PANEL ASSY, TOP, identified by Part Number 900-51170, from Manufacturer L3HARRIS MARITIME POWER (04801). The furnished item must meet the requirements specified in the ordering data and throughout the contract/purchase order, including design, material, and dimensions. There are no technical drawings or data associated with this solicitation; the part number is fully descriptive.
Contract & Timeline
- Type: Solicitation
- Set-Aside: None specified (Small Business Program Representations clause included)
- Response Due: March 23, 2026, 8:30 PM UTC
- Published: February 23, 2026, 9:20 AM UTC
- Pricing Validity: Quotations are valid for 60 days after the closing date, unless otherwise specified by the offeror.
Key Requirements & Instructions
- Technical Specifications: The item must be in accordance with the specified manufacturer (L3HARRIS MARITIME POWER) and Part Number (900-51170).
- Mercury Exclusion: No mercury or mercury-containing compounds shall be intentionally added or come into direct contact with the hardware.
- Document Precedence: In case of conflict, Section "C" of the contract/purchase order takes precedence over Section "D". A detailed order of precedence for technical documents is provided.
- Document Revisions: Contractors must comply with specified revisions of documents. Written approval is required for using other revisions or portions of different revisions.
- Waivers/Deviations: Any material not in full compliance with technical requirements must be identified as an exception in advance. Requests for delivery date extensions or waivers/deviations require justification and an offer of consideration.
- Quality Assurance: The contractor must provide and maintain an inspection system acceptable to the Government.
- Packaging: Packaging requirements follow MIL-PRF-23199, MIL-DTL-24466 for cleanliness control, and MIL-STD 2073. Fire retardant packaging is no longer required.
- Data Deliverables: A Certificate of Compliance (DI-MISC-81356) is required at the time of material delivery for each unique combination of Contract/Purchase Order Number, National Stock Number, and Item Nomenclature. Detailed instructions for DD Form 1423 are provided.
Contact Information
- Primary Contact: ANDREW.C.LYTER.CIV@US.NAVY.MIL
- Phone: 5642302573