Parking Lot Painting & Redesign

SOL #: 26QA002Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NORFOLK
NORFOLK, VA, 23510-1096, United States

Place of Performance

Norfolk, VA

NAICS

Highway (237310)

PSC

Maintenance Of Parking Facilities (Z1LZ)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 27, 2026
2
Response Deadline
Feb 13, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers, Norfolk District, is conducting a Sources Sought to identify qualified contractors for Parking Lot Striping and Painting at their facility in Norfolk, Virginia. This is a one-time service to clean, black out existing markings, and re-stripe the parking lot with a new Government-approved design, including EV charging stations. Responses are due February 13, 2026.

Scope of Work

The contractor shall provide all personnel, equipment, materials, and supervision to perform a one-time cleaning and restriping of the parking lot. Key tasks include:

  • Cleaning the entire parking lot using commercial-grade equipment.
  • Blacking out all existing lettering and striping.
  • Re-striping all parking spaces (standard, handicap, van-accessible) according to a new Government-approved design.
  • Stenciling "RESERVED" in designated areas with yellow paint.
  • Stenciling four (4) Electric Vehicle (EV) charging stations with green paint.
  • Developing and submitting two distinct parking lot design layout options for Government review and selection prior to work commencement.
  • Ensuring all striping is straight, uniform, and free from overspray.

Deliverables & Standards

  • Two parking lot design layout options.
  • Completion of all striping and stenciling work.
  • Work must meet industry standards for parking lot striping and ADA compliance.
  • Paint must be durable, weather-resistant, uniform, sharply defined, and applied in dry conditions.
  • Compliance with OSHA Regulations and Federal/Virginia DOT standards for pavement markings.

Contract & Timeline

  • Type: Sources Sought / Market Research
  • Duration: One-time service, to be completed within 30 calendar days of contract award.
  • Set-Aside: None specified.
  • Response Due: February 13, 2026, at 2:00 PM EST.
  • Published: January 27, 2026.
  • Place of Performance: U.S. Army Corps of Engineers, 803 Front Street, Norfolk, Virginia 23510.

Information Requested from Respondents

Interested parties should address their experience with:

  • Parking lot striping and painting projects of similar size/scope within the past five years.
  • Striping ADA compliant handicap and van-accessible spaces.
  • Performing pavement marking work for federal government facilities.
  • Providing parking lot striping options for Government review.
  • Equipment and paint materials used to ensure durability and weather resistance.
  • Ability to complete the service within 30 calendar days of contract award.

Attachments

A "North Parking Plan" document (Parking Layout Oct 2025-1.pdf) provides a visual and quantitative reference for parking arrangements, including a legend, general notes, and a detailed count of existing and new parking spaces by type (Truck, Standard, Compact, Parallel Parking, Motorcycle). This is crucial for understanding the physical scope.

People

Points of Contact

Files

Files

Download
Download
Download

Versions

Version 1Viewing
Sources Sought
Posted: Jan 27, 2026
Parking Lot Painting & Redesign | GovScope