PARTS KIT,AUXILLIAR

SOL #: SPRRA1-26-Q-0019SolicitationSole Source

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT HUNTSVILLE, AL
REDSTONE ARSENAL, AL, 35898-7340, United States

Place of Performance

Place of performance not available

NAICS

Turbine and Turbine Generator Set Units Manufacturing (333611)

PSC

Gas Turbines And Jet Engines, Non Aircraft; And Components (2835)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 4, 2026
2
Submission Deadline
Apr 3, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Defense Logistics Agency (DLA) Aviation at Huntsville, AL has issued a Solicitation for a Firm-Fixed-Price (FFP), One-Time Buy (OTB) contract for Auxiliary Parts Kits (NSN: 2835-01-502-9217, PN: 924-040). This requirement is restricted to AAR SUPPLY CHAIN, INC. (CAGE: 1Y249) as the sole responsible source, in accordance with 10 U.S.C. 2304 (c)(1) FAR 6.302-1. The kits are for the CH-47 Turbine Engine (T55) weapon system. Quotations are due April 3, 2026.

Scope of Work

  • Supplies: PARTS KIT, AUXILLIAR (NSN: 2835-01-502-9217, Mfr Part Number: 924-040)
  • Purpose: Support for the CH-47 Turbine Engine (T55) weapon system.
  • Packaging & Marking: MIL-STD-129 markings required; contractor-furnished containers.
  • Inspection & Acceptance: At origin.
  • Delivery: FOB Destination.
  • Delivery Schedule: 5 units within 270 days after award, and 2 units within 300 days after award.

Contract & Timeline

  • Type: Firm Fixed-Price (FFP), One-Time Buy (OTB) Solicitation
  • Set-Aside: Sole Source (Restricted to AAR SUPPLY CHAIN, INC.)
  • Quotation Due: April 3, 2026, by 21:00:00Z
  • Published: March 4, 2026

Submission & Evaluation

  • Submission Method: Quotations must be submitted via email; facsimile quotes will not be accepted.
  • Evaluation Criteria: Technical acceptability is required. Proposals must conform to all solicitation requirements, terms, conditions, representations, certifications, and technical requirements. Pricing will be evaluated for reasonableness.

Additional Notes

This is a Defense Priority and Allocations System (DPAS) rated order. The Product Quality Deficiency Reports (PQDRs) program will be utilized. Accelerated delivery is encouraged and authorized at no additional cost to the Government. Offerors may be required to submit "other than cost and pricing data" if requested. Specific clauses regarding Wide Area WorkFlow (WAWF) for payment instructions are included.

People

Points of Contact

Scott AlexanderPRIMARY
IMELDA CHAGOLLASECONDARY

Files

Files

Download

Versions

Version 1Viewing
Solicitation
Posted: Mar 4, 2026
PARTS KIT,AUXILLIAR | GovScope