PATTON HALL NEW STRATEGIC ENGAGEMENT PLATFORM, JOINT BASE MYER-HENDERSON HALL, VA.
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is a revised Sources Sought notice for the Patton Hall New Strategic Engagement Platform project at Joint Base Myer-Henderson Hall, VA. The project has been reclassified as a Military Construction (MILCON) project, leading to a delay in solicitation. The acquisition strategy, while remaining Design-Build, may shift from Design-Build to Budget (DB2B) to Progressive Design-Build. Contractors should monitor this notice for future updates.
Purpose & Status
The Department of the Army has determined that the Patton Hall New Strategic Engagement Platform project will now be funded as a Military Construction (MILCON) project. This change necessitates new programming steps, resulting in a delay of the solicitation. The U.S. Army Corps of Engineers (USACE), Baltimore District, is re-evaluating the specific Design-Build acquisition method, potentially moving from Design-Build to Budget (DB2B) to a Progressive Design-Build approach.
Project Scope
The project involves the design and construction of a new 70,600 SF Community Club and Conference Center at Joint Base Myer-Henderson Hall, Fort Myer, VA. This includes the demolition of Building 214 (except the Jailhouse), site preparation, utilities, landscaping, and force protection. The new facility must be designed for a 50-year useful life, comply with DoD Antiterrorism standards, ABA, and Cyber Security Measures, and aim for a minimum LEED Silver rating. The estimated magnitude of construction is between $50,000,000 and $100,000,000. The primary NAICS code is 236220 "Commercial and Institutional Building Construction" with a $45,000,000 small business size standard.
Key Changes & Action Items
- Funding: Project is now MILCON funded, causing delays.
- Acquisition Strategy: May change from DB2B to Progressive Design-Build.
- Monitoring: Interested parties are advised to monitor this notice for future updates.
- Questions: ALL questions and correspondence must be directed to
cenab-contracting@usace.army.mil. Communications to other contacts will not be addressed. - Previous Deadlines: Previous requests for DRAFT RFP feedback (due Jan 10, 2026) and capability statements (due July 18, 2025) are superseded by this delay announcement.
Contract Details
- Type: Sources Sought (Market Research, now updated with project delay and MILCON funding).
- Delivery Method: Design-Build (specific method under review).
- Set-Aside: None specified for the future solicitation; however, the NAICS code (236220) has a $45M small business size standard, indicating potential for small business participation.
- Agency: Department of the Army / USACE Baltimore District.
- Place of Performance: Joint Base Myer-Henderson Hall, Fort Myer, VA.
- Published Date: April 13, 2026 (latest revision).