H--Perform Park-wide Cross Connection Survey, Cross C

SOL #: 140P8126Q0008Combined Synopsis/Solicitation

Overview

Buyer

Interior
National Park Service
PWR LAME(81000)
BOULDER CITY, NV, 89005, United States

Place of Performance

Place of performance not available

NAICS

Plumbing (238220)

PSC

Inspection And Laboratory Services (Except Medical/Dental): Plumbing, Heating, And Waste Disposal Equipment (H345)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 3, 2026
2
Last Updated
Mar 11, 2026
3
Submission Deadline
Mar 18, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), specifically Death Valley National Park, is soliciting proposals for a Firm Fixed-Price contract to perform Park-wide Cross Connection Surveys and Backflow Prevention Testing. This Total Small Business Set-Aside opportunity requires contractors to ensure compliance with California State Water Resources Control Board regulations. Proposals are due March 18, 2026, at 1300 PDT.

Scope of Work

The contractor will conduct cross-connection control inspections across eight water systems within Death Valley National Park, covering 265 service connections. Key tasks include:

  • Developing and submitting a Cross Connection Control Management Plan (CCCMP) for each water system, adhering to the California State Water Resources Control Board's CCCPH.
  • Performing certified operational testing of 67 backflow prevention assemblies.
  • Identifying deficiencies and executing minor repairs on backflow prevention devices, with a cost threshold of up to $175 per device. Major repairs are excluded.
  • Providing certified test reports, deficiency lists, repair logs, updated inventory, and a compliance summary for Electronic Annual Report (eAR) reporting.
  • All work must comply with California Health and Safety Code Sections 116407 and 116555.5, and the CCCPH (effective July 1, 2024).

Contract Details

  • Type: Firm Fixed-Price
  • NAICS: 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a $19M small business size standard.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Period of Performance:
    • Base Year: April 1, 2026, to June 19, 2026.
    • Option Years: Four option years, each from April 1 to September 20.
  • Estimated Value: The pricing schedule indicates an estimated net construction cost of $158,525.49 for the cross-connection work across the base and option years.

Submission Requirements

Offers must be submitted via email to Bradley_Metler@nps.gov. Required submission items include:

  • Completed and signed SF 1449.
  • Personnel Certifications.
  • Past Performance documentation (3-6 references).
  • Completed Provisions.
  • Price Schedule (Excel Spreadsheet).
  • Contractor Core Data.

Evaluation Criteria

Award will be based on a comparative evaluation considering:

  • Personnel Certifications: Certified Cross-Connection Control Specialist and Certified Backflow Prevention Assembly Tester (screen-out factor).
  • Price.
  • Past Performance.

Key Clarifications & Notes

  • The park is currently in violation of the July 1, 2025, deadline for Cross-Connection Control Plan submission.
  • NPS will provide escorts and access to locations, including locked areas.
  • Contractor personnel must include a Certified Cross-Connection Control Specialist and a Certified Backflow Prevention Assembly Tester, both recognized by the SWRCB.
  • Liability insurance is required.
  • Travel times to various park locations are provided for planning.
  • This is a Combined Synopsis/Solicitation; no separate written solicitation will be issued.

People

Points of Contact

Metler, BradleyPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 3, 2026
View
H--Perform Park-wide Cross Connection Survey, Cross C | GovScope