Phase I Pre-Qualifications for Runway Repair and Airfield Lighting RFP
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Army, through W31R ENDIS MIDDLE EAST, is initiating a Phase I Pre-Qualification process for a future Runway Repair and Airfield Lighting Request for Proposal (RFP). This effort aims to establish a pre-qualified pool of contractors for a firm-fixed price (FFP) Design-Bid-Build (DBB) contract. The project is located at an undisclosed site within the Kingdom of Jordan. Responses for pre-qualification are due June 25, 2026.
Scope of Work
The primary scope involves comprehensive pavement repair and replacement of concrete pavement. This includes replacing 13,504 Square Meters (SM) of Portland Cement Concrete (PCC) pavement and 13,354 SM of asphalt with new, modified-heavy load concrete to extend a military runway's touchdown zone. All work must comply with International Civil Aviation Organization (ICAO) standards and includes replacing associated lighting and markings. Contractors must demonstrate capability in Civil Works, specifically earthwork, runway construction, and repair within Jordan. A secondary scope involves design-after-award work for the foundational structure of Aircraft Arresting System (AAS) Absorber Shelters.
Contract & Timeline
- Type: Phase I Pre-Qualification for a future FFP Design-Bid-Build (DBB) contract.
- Duration: Anticipated period of performance for the awarded project is 540 calendar days after Notice to Proceed (NTP).
- Set-Aside: None specified (Full and Open Competition for Phase I).
- Pre-Qualification Response Due: June 25, 2026, 7:00 PM GMT.
- Published: June 10, 2026.
Evaluation
Only pre-qualified contractors will receive the Phase 2 RFP. Phase 2 proposals will be evaluated using best value trade-off source selection procedures in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 15 (Contracting by Negotiation) and RFO Part 36 (Construction and Architect-Engineer Contracts).
Additional Notes
This is a two-phase acquisition. Phase 1 establishes a pre-qualification pool, followed by a limited competition RFP (Phase 2) issued only to pre-qualified firms. The project site is in the Kingdom of Jordan. Points of contact are Jerry O. Andes II and Diane E. deLathouder.