Pier Fuel Reel Replacements for CG Air Station Port Angeles

SOL #: 70Z03326Q2019000001Combined Synopsis/Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
BASE SEATTLE(00033)
SEATTLE, WA, 98134, United States

Place of Performance

Port Angeles, WA

NAICS

Other Building Equipment Contractors (238290)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 30, 2026
2
Submission Deadline
May 27, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) is soliciting quotes for Pier Fuel Reel Replacements at Air Station Port Angeles, WA. This project involves removing and replacing existing diesel and gasoline hose reels, including new enclosures, electronic winding, and associated components. This is a 100% Small Business Set-Aside with a firm-fixed-price purchase order. Quotes are due by May 27, 2026, at 2:00 PM PDT.

Scope of Work

The contractor will provide all personnel, equipment, and services necessary to:

  • Remove and dispose of existing diesel and gasoline hoses and associated components.
  • Install one (1) new diesel hose reel and one (1) new gasoline hose reel.
  • Install new weather-tight stainless-steel enclosures for both reels.
  • Integrate electronic winding capability and level-wind arms for both reels.
  • Replace existing 200 ft. diesel and gasoline fuel hoses with 1" diameter hoses.
  • Install two new reel assemblies (stainless steel or aluminum), configured for 1" diameter x 200' fuel hose, with 120V motorized rewind mechanisms and explosion-proof switches/wiring. Approved models include Hannay Reel EPJ.
  • Manage and dispose of all generated wastes according to environmental regulations.
  • The period of performance shall not exceed 30 calendar days from the award date.

Contract Details

  • Contract Type: Firm-Fixed-Price Purchase Order
  • Set-Aside: Total Small Business (FAR 19.5)
  • NAICS Code: 238290 (Other Building Equipment Contractors)
  • Product Service Code: J045 (Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment)
  • Place of Performance: U.S. Coast Guard Air Station Port Angeles, 1 Ediz Hook Rd., Port Angeles, WA 98362.
  • Personnel Requirements: Contractor employees must undergo background investigations for recurring access to government facilities/CUI and must be U.S. citizens or lawfully admitted permanent residents. A Project Manager fluent in English is required.
  • Wage Determination: Bidders must adhere to the U.S. Department of Labor Wage Determination for Clallam and Jefferson Counties, WA, including minimum wage rates and fringe benefits (e.g., $5.55/hr standard H&W).

Key Dates & Submission Requirements

  • Mandatory Site Visit: May 20, 2026, 8:00 AM - 1:00 PM PDT. RSVP to Taela Moye (taela.m.moye@uscg.mil) by May 18, 2026.
  • Questions Due: May 22, 2026, by 3:00 PM PDT. Submit in writing to taela.m.moye@uscg.mil, referencing RFQ 70Z03326Q2019000001.
  • Quotes Due: May 27, 2026, by 2:00 PM PDT.
  • Submission: Electronically to taela.m.moye@uscg.mil with RFQ 70Z03326Q2019000001 in the subject line.
  • Quote Components:
    1. SF 1449: Completed and signed, with total firm-fixed-price bid.
    2. Price Quotation: Detailed breakdown (max 1 page) including removal/disposal, materials/installation, reel systems, electrical work, and labor.
    3. Technical Proposal: (max 2 pages, no pricing) Demonstrating understanding and ability, including technical approach, list of major materials/equipment (with manufacturer/model for reels), and a project schedule showing completion by July 31, 2026.

Evaluation & Award

Award will be made to the low-cost, responsible, and responsive offeror providing the most advantageous, reasonable, and negotiable offer. Contractors must be registered in SAM.gov prior to award.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
Pier Fuel Reel Replacements for CG Air Station Port Angeles | GovScope