PINTO MESA CUT AND PILE PHASE 2 BLM

SOL #: 140L3726Q0024Combined Synopsis/Solicitation

Overview

Buyer

Interior
Bureau Of Land Management
NATIONAL INTERAGENCY FIRE CENTER
BOISE, ID, 83705, United States

Place of Performance

Place of performance not available

NAICS

Support Activities for Forestry (115310)

PSC

Tree Thinning Services (F014)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 5, 2026
2
Last Updated
Mar 5, 2026
3
Submission Deadline
Mar 24, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Land Management (BLM), National Interagency Fire Center, is seeking proposals for PINTO MESA CUT AND PILE PHASE 2 fuels management services. This Total Small Business Set-Aside opportunity involves cutting and piling pinyon and juniper trees on approximately 432 acres in Pinto Mesa, located west of Meeker, Colorado. The resulting contract will be a firm-fixed price purchase order. Quotes are due by March 24, 2026, at 9:00 a.m. Mountain Time.

Scope of Work

The project requires contractors to cut and pile pinyon and juniper trees with a diameter at breast height (DBH) of 12 inches or less, using contractor-furnished crews and chainsaws. Key tasks include:

  • Treating approximately 432 acres, incorporating existing standing dead and dead/down material into piles.
  • Ensuring stumps are cut to 4 inches or less and all live branches are severed.
  • Hand-piling material between 1/4 and 12 inches in diameter.
  • Constructing piles 10 feet wide by 10 feet tall (not exceeding 12x12 feet), spaced at least 10 feet apart, and at least 50 feet from private land, survey monuments, power lines, and drainages.
  • Adhering to an Acceptable Quality Level (AQL) of 85 percent Work Quality Level, subject to government inspections.

Period & Place of Performance

  • Contract Duration: July 16, 2026, to November 30, 2026.
  • Work Prohibitions: No work between December 15, 2025, and July 15, 2026, due to big game and migratory bird timing. An exception allows work between September 16, 2026, and March 14, 2027, if the Palmer Drought Severity Index is severe, extreme, or exceptional on July 1st.
  • Location: Approximately 32 miles west of Meeker, CO (Township 1N, Range 99W, Sections 26, 27, 34, 35).

Contract Details

  • Contract Type: Firm-Fixed Price.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS Code: 115310 – Support Activities for Forestry – Fuels Management Services.
  • Small Business Size Standard: $34.0 million.
  • Wage Determination: Bidders must adhere to the U.S. Department of Labor Wage Determination 1976-1351, Rev 78, which specifies minimum wage rates and fringe benefits for various occupations in Colorado.

Submission & Evaluation

  • Quotes Due: Tuesday, March 24, 2026, at 9:00 a.m. Mountain Time.
  • Submission Method: Via email to drosales@blm.gov.
  • Required Submissions: Signed SF-1449, any amendments, Unique Entity ID (UEI), and CAGE code.
  • Evaluation Factors: Award will be made to the responsible vendor whose quote conforms to the solicitation and technical evaluation factors, which include Project Experience, Technical Capability, and Price.
  • Registration: Contractors must be registered and active in the System for Award Management (SAM).

Additional Notes

Contractors are responsible for providing all equipment, fuel, and personnel, and must ensure equipment is cleaned of noxious weeds. An English-speaking representative must be on-site at all times. Fire prevention measures and PPE compliance are mandatory. A site visit contact, Shane Pfeiffer (970-620-6957), is provided, though no formal site visit is currently scheduled.

People

Points of Contact

Rosales, DanielPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 2
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 5, 2026
F--PINTO MESA CUT AND PILE PHASE 2 BLM | GovScope