PLA Survey - ERCIP Lake City Army Ammunition Plant Microgrid and Backup Power

SOL #: 699479d7fa4d4ae9b28a05eeaf1adc94Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

Independence, MO

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 9, 2026
2
Action Date
Feb 24, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Army Corps of Engineers (USACE) Louisville District has issued a Special Notice to conduct a Project Labor Agreement (PLA) Survey for an upcoming large-scale construction project at the Lake City Army Ammunition Plant in Independence, Missouri. This is a market research effort to solicit comments from the construction community regarding the potential use of a PLA; no proposals are being requested at this time. Responses are due by February 24, 2026.

Scope of Work

The anticipated project involves the Design-Bid-Build (D-B-B) construction of a microgrid system and backup power infrastructure. Key technical requirements include:

  • Power Generation: Two 7.5 MW combined heat and power (CHP) combustion turbines (15 MW total) with dual-fuel (natural gas and propane) systems.
  • Infrastructure: Heat recovery steam generators (HRSGs), supplemental exhaust duct firing, and a black start diesel generator.
  • Electrical & Controls: Underground duct banks, electrical distribution equipment, and state-of-the-art microgrid controls for island mode, black start, and load shedding.
  • Cybersecurity: Implementation of Software Defined Networking (SDN) in accordance with UFC 4-010-06 and UFGS 25 05 11.
  • Ancillary Work: Installation of two 500-gallon waste water/oil underground storage tanks, site improvements, demolition, and full commissioning.

Contract & Timeline

  • Notice Type: Special Notice (PLA Survey)
  • Estimated Project Value: Exceeding $35,000,000
  • Set-Aside: None specified (Market Research)
  • Response Due Date: February 24, 2026, at 2:00 PM EST
  • Place of Performance: Independence, MO

Evaluation & Feedback

The Government is specifically seeking feedback on:

  • Local knowledge of PLA usage on similar projects.
  • Availability of skilled labor in the Missouri area.
  • Potential cost impacts (positive or negative) of requiring a PLA.
  • Whether a PLA would advance federal interests in economy and efficiency.

Additional Notes

Interested firms are encouraged to provide detailed rationale regarding their interest in proposing if a PLA is or is not required. Comments should be submitted via email to Alexa Dukes at alexa.l.dukes@usace.army.mil.

People

Points of Contact

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Special Notice
Posted: Feb 9, 2026
PLA Survey - ERCIP Lake City Army Ammunition Plant Microgrid and Backup Power | GovScope