PLC PANEL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy / NAVSUP Weapon Systems Support Mech is soliciting proposals for a PLC PANEL. This solicitation has been amended to extend the close date to January 30, 2026, and adds a 100%, 365-day option to subClin 0001AA. Only authorized distributors of the original manufacturer's item will be considered, and proof is required with the offer.
Scope of Work
This contract requires the manufacture and quality assurance of a PLC PANEL according to specified Cage Code/Reference Number Items and marking standards (MIL-STD-130, REV N). Key requirements include:
- Furnishing the design represented by specific Cage Code(s) and reference number(s).
- Physical identification in accordance with MIL-STD-130.
- Strict control over design, material, servicing, or part number changes, requiring PCO approval for most changes.
- Contractor responsibility for all inspection requirements and maintaining records for 365 days.
- Packaging in accordance with MIL-STD 2073.
Contract & Timeline
- Type: Solicitation (Resultant award will be bilateral, requiring contractor acceptance)
- Product Service Code: 6110 (Electrical Control Equipment)
- Set-Aside: None specified. Important Note: Only authorized distributors of the OEM will be considered.
- Proposal Due: January 30, 2026, 20:30 UTC (Extended by amendment)
- Published: December 31, 2025
Evaluation
Award will be issued bilaterally, requiring the contractor's written acceptance. Offerors must verify nomenclature, part number, and NSN prior to responding. Government source inspection is required. Consideration for award is limited to authorized distributors, who must provide proof on company letterhead with their offer.
Additional Notes
Accelerated delivery is encouraged. All freight is FOB Origin. Offerors must provide Unit Price, Total Price, Procurement Turnaround Time (PTAT), Awardee CAGE, and Inspection & Acceptance CAGE. Traceability is important; non-manufacturers must provide an OEM authorization letter/email.