Port Engine Removal / Install
SOL #: 52000PR260003023Combined Synopsis/Solicitation
Overview
Buyer
Homeland Security
Us Coast Guard
SFLC PROCUREMENT BRANCH 3(00040)
BALTIMORE, MD, 21226, United States
Place of Performance
Monterey, CA
NAICS
Ship Building and Repairing (336611)
PSC
Maintenance, Repair And Rebuilding Of Equipment: Ship And Marine Equipment (J020)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Jan 30, 2026
2
Last Updated
Feb 10, 2026
3
Submission Deadline
Feb 12, 2026, 2:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Coast Guard is soliciting proposals for Port Engine Replacement services on vessel 47224 at Station Monterey, CA. This is a Total Small Business Set-Aside opportunity, anticipating a Firm Fixed-Price Purchase Order. The work involves removing the old port engine and installing a new Coast Guard-provided engine, followed by sea trials. Quotes are due by February 12, 2026, at 2:00 PM EST.
Scope of Work
Contractor responsibilities include:
- Hauling out the vessel.
- Removing the existing port diesel engine and all associated auxiliary systems.
- Installing a new Coast Guard-provided port diesel engine.
- Swapping necessary parts from the old engine to the new one.
- Returning the vessel to the water.
- Conducting sea trials and full power trials with Coast Guard representatives.
- Providing general labor, equipment, crane services, specialty material, and facilities. All work must comply with applicable Coast Guard Drawings, Maintenance Procedure Cards (MPCs), and Technical Publications.
Contract & Timeline
- Contract Type: Firm Fixed Price Purchase Order
- Period of Performance: Work to commence within 21 days of acceptance and be completed within a reasonable timeframe.
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: February 12, 2026, 2:00 PM EST
- Published Date: February 10, 2026
Submission & Evaluation
- Submission Method: Email quotes to Joshua.C.Richardson2@uscg.mil. The subject line must include the solicitation number (52000PR260003023).
- Evaluation Criteria: Quotes will be evaluated based on Technical Capability, Past Performance, and Price.
Additional Notes
- Invoicing will be processed through https://www.ipp.gov.
- The solicitation incorporates FAR clauses effective through Federal Acquisition Circular 2005-87 (March 7, 2016).
- For technical questions, contact Montrese Clay (Montrese.J.Clay@uscg.mil). For contracting inquiries, contact Joshua Richardson (Joshua.C.Richardson2@uscg.mil).
People
Points of Contact
Joshua RichardsonPRIMARY
Files
Files
Versions
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Feb 10, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Jan 30, 2026