Portfolio Acquisition Executive (PAE) Fires Access Control System (ACS)

SOL #: PANRSA-26-P-0000-025440Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W6J1 RCCTO REDSTONE
REDSTONE ARSENAL, AL, 35898-0000, United States

Place of Performance

Redstone Arsenal, AL

NAICS

Security Systems Services (except Locksmiths) (561621)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Alarm, Signal, And Security Detection Systems (J063)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 20, 2026
2
Response Deadline
Mar 2, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army is conducting market research via a Sources Sought notice for Access Control System (ACS) maintenance and support services for the Portfolio Acquisition Executive (PAE) Fires facilities primarily at Redstone Arsenal, AL, and Madison, AL. This effort seeks to identify qualified contractors capable of providing comprehensive maintenance, unscheduled services, upgrades, and repairs for extensive ACS infrastructure. Capability statements are due March 2, 2026.

Scope of Work

The contractor will provide all personnel, labor, equipment, and supplies for comprehensive maintenance of PAE Fires' ACS, which includes cameras, CCTV, turnstiles, badge readers, magnetic locks, gates, and sensors. Key services include:

  • Quarterly Scheduled Maintenance: Inspections of all ACS equipment.
  • Unscheduled Maintenance: 24/7 on-call availability for critical failures, requiring on-site assessment within 1 hour and resolution within 24 hours for critical issues.
  • Upgrade/Installation/Repair/Modification: Procurement, installation, integration, and compatibility assurance for new hardware and software.
  • Reporting: Detailed service reports to the Contracting Officer's Representative.
  • System Expertise: Required certifications include Lenel OnGuard Federal Value-Added Reseller and Avigilon Certified (ACC Administrator, Operator, Installation, System Design).
  • System Scale: Approximately 392 interior/exterior badge readers, 9 turnstiles, 170 cameras, 9 physical gates, 6 operator terminals, 4 air phones, and 2 badging equipment sets.

Contract & Timeline

  • Type: Sources Sought (Market Research)
  • Anticipated Period of Performance: July 2026 through December 2031 (1-year base, four 1-year options, one 6-month extension).
  • Place of Performance: Redstone Arsenal, AL (Bldgs 111, 112, 5250, 3300, 3301, 3303, SG100) and Madison, AL.
  • Response Due: March 2, 2026, 1600 EST.
  • Published: February 20, 2026.

Submission Requirements

Interested vendors must submit a capability statement (max 5 pages) including:

  • Company information (UEI, CAGE, POC).
  • Business size and socio-economic status.
  • Detailed narrative of technical capability.
  • Confirmation of contractor employees having a final DoD Secret clearance by FY26 Q4.
  • Identification of two relevant projects (24+ months, US Army installation, last 5 years, similar scope/size/complexity, supporting Lenel OnGuard and Avigilon).
  • Documentation of Lenel OnGuard and Avigilon training/certifications/licenses, including LENEL VAR license.
  • Confirmation of ability to meet the 1-hour critical level unscheduled maintenance on-site response requirement.

Additional Notes

This is for market research only and does not constitute a solicitation or commitment by the Government. Submissions must be UNCLASSIFIED and sent via email to simone.l.brightmon.civ@army.mil, sydney.m.horn.civ@army.mil, and tuyet.h.clark.ctr@army.mil with the subject line "Sources Sought for PAE Fires ACS".

People

Points of Contact

Simone BrightmonPRIMARY
Sydney HornSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Sources Sought
Posted: Feb 20, 2026
Portfolio Acquisition Executive (PAE) Fires Access Control System (ACS) | GovScope