POWER CONTROL PANEL
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support Mech, is soliciting quotes for the repair of POWER CONTROL PANELS. This is a Solicitation for 5 units, with a required Repair Turnaround Time (RTAT) of 75 days. Quotes are due by April 10, 2026.
Scope of Work
This Request for Quotation (RFQ) is for the repair of POWER CONTROL PANELS, identified by CAGE 16331, Ref. No. 63E920532G1. The requirement is for 5 units. Repairs must meet operational and functional requirements, adhering to the contractor's standard practices, manuals, and directives. Government Source Inspection (GSI) is required.
Contract & Timeline
- Opportunity Type: Solicitation (RFQ for repair)
- Award Type: Bilateral, requiring contractor's written acceptance.
- Set-Aside: None specified
- Response Due: April 10, 2026, at 8:30 PM EDT
- Published Date: March 11, 2026
Key Requirements
Offerors must provide quotes including Unit Price, Total Price, and proposed Repair Turnaround Time (RTAT). If the Government's requested 75-day RTAT cannot be met, capacity constraints must be detailed. Quotes should also include information for Testing and Evaluation (T&E) fees if an asset is determined Beyond Repair (BR/BER), and details for awardee, inspection, and facility CAGE codes. Only authorized distributors of the original manufacturer's item will be considered, and proof of authorization on company letterhead is required with the offer. Marking must comply with MIL-STD-130, REV N, 16 NOV 2012.
Additional Notes
Freight is FOB Origin and handled by Navy CAV or Proxy CAV. A price reduction will be incurred for unexcusable delays in meeting the required RTAT, with the contractor to provide the proposed reduction amount per unit per month, up to a maximum. The solicitation also requests new unit price and delivery lead-time for comparison purposes.