POWER SUPPLY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support Mech, is seeking quotes for the repair of POWER SUPPLY units. This Request for Quote (RFQ) requires a Firm-Fixed Price (FFP) or Not-to-Exceed (NTE) price for repair services. Bidders must be an authorized repair source. The offer due date has been extended to February 2, 2026.
Scope of Work
This opportunity covers the repair and associated quality requirements for POWER SUPPLY units (Product Service Code 6130: Converters, Electrical, Nonrotating). Key requirements include:
- Repair Services: All repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings, technical orders, and approved repair standards.
- Repair Turnaround Time (RTAT): A required RTAT of 342 days after receipt of asset. A price reduction will be incurred for failure to meet this RTAT due to inexcusable contractor delay.
- Packaging & Marking: MIL-STD Packaging, MIL-STD 2073 for packaging, and MIL-STD-130, REV N for physical identification.
- Inspection: Government Source Inspection and contractor responsibility for all inspection requirements, with records maintained for 365 days.
- Reporting: Commercial Asset Visibility (CAV) Reporting and adherence to Item Unique Identification (IUID) requirements (DFARS 252.211-7003).
Contract & Timeline
- Type: Request for Quote (RFQ) for repair services, resulting in a bilateral award.
- Pricing: Firm-Fixed Price (FFP) or Not-to-Exceed (NTE). Quotes limited to test and evaluation (T&E) will not be accepted.
- Set-Aside: None specified.
- Offer Due Date: February 2, 2026, at 8:30 PM EST.
- Published Date: December 2, 2025.
- Option for Increased Quantity: The Government intends to include an option for up to a 100% increase (61EA) in quantity for a period of 341 days, incorporating FAR Clause 52.217-6.
Key Requirements for Response
Quotes must include:
- Repair unit price, total price, and proposed RTAT.
- New unit price and T&E fee/price (if asset is determined Beyond Economical Repair/Beyond Repair).
- CAGE codes for award, inspection & acceptance, facility/subcontractor, and packaging.
- Cost breakdown (if feasible) and quote expiration date (minimum 90 days).
- Proof of being an authorized distributor of the original manufacturer's item, provided on company letterhead.
Additional Notes
Accelerated delivery is encouraged. The contractor must provide a throughput constraint for each NSN. Induction expiration date is 342 days after contract award.