POWER SUPPLY

SOL #: SPRTA1-25-R-0399Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Defense Logistics Agency
DLA AVIATION AT OKLAHOMA CITY, OK
TINKER AFB, OK, 73145-3070, United States

Place of Performance

Place of performance not available

NAICS

Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)

PSC

Converters, Electrical, Nonrotating (6130)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 13, 2026
2
Response Deadline
Apr 30, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

This is a Presolicitation Notice (Amendment 0001) from the Defense Logistics Agency (DLA) Aviation at Oklahoma City, OK, for Power Supplies (NSN: 6130-01-209-9062HY / P/N: 709290-2). The notice refers to RFP SPRTA1-25-R-0399, which was anticipated to be issued on June 26, 2025, with proposals due on July 28, 2025. The presolicitation notice itself has a response date of April 30, 2026, for general inquiries or comments.

Scope of Work

The requirement is for 73 Power Supplies, with a delivery date of November 15, 2026. The procurement includes a First Article Exhibit and a First Article Test Report. The Power Supplies must comply with Unique Item Identification (IUID) requirements per MIL-STD-130, with specific marking details provided in engineering orders and checklists. Packaging must adhere to MIL-STD-129 and MIL-STD-2073-1, including restrictions on wood packaging material.

Contract Details

  • Opportunity Type: Presolicitation (referencing RFP SPRTA1-25-R-0399)
  • Contract Type: Firm Fixed Price
  • Anticipated RFP Issue Date: June 26, 2025 (RFP document states June 30, 2025)
  • Anticipated RFP Response Date: July 28, 2025 (RFP document states July 30, 2025)
  • Presolicitation Response Date: April 30, 2026
  • Set-Aside: The requirement is anticipated to be competitive, though current qualified sources are limited (Symetrics Industries) under FAR 6.302 for supplies available from a limited number of sources. The RFP document indicates "UNRESTRICTED OR SET ASIDE" with NAICS 336413 (1,250 employees).
  • Agency: DLA Aviation at Oklahoma City, OK
  • Product Service Code: 6130 - Converters, Electrical, Nonrotating

Key Requirements & Deliverables

  • Power Supply: NSN 6130-01-209-9062HY, P/N 709290-2.
  • Quantities: 73 EA (range 19-114).
  • First Article: Includes a First Article Exhibit and a First Article Test Report (Data Item A001, DI-NDTI-80809B/T), due 180 days after contract award. Production cannot begin until First Article approval.
  • IUID: Items must be marked with a Unique Item Identifier (UII) per MIL-STD-130.
  • Test/Inspection Report: Detailed format and content requirements are specified for documenting test results.
  • Packaging: Compliance with MIL-STD-129 and MIL-STD-2073-1, with specific instructions for Wood Packaging Material (WPM).
  • Transportation: Detailed transportation data (DD Form 1653) outlines F.O.B. terms, provisions, funding, and "Ship To" information for Tinker AFB and DLA Distribution Depot Oklahoma.

Submission & Evaluation

Proposals for the referenced RFP were anticipated by July 28/30, 2025. Evaluation for the RFP includes a First Article cost factor of $13,500.00 per Lot/Item. An Ombudsman is available for concerns regarding the acquisition process at (405) 855-3552.

Contact Information

People

Points of Contact

Lori LumsdenPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Pre-Solicitation
Posted: Apr 13, 2026
POWER SUPPLY | GovScope