POWER SUPPLY DRAWER
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support Mech, is soliciting proposals for the repair of POWER SUPPLY DRAWERs. This will result in a Firm-Fixed Price contract that will be bilaterally definitized. The opportunity includes an option for increased quantity and is a rated order for national defense use. Quotes are due by April 2, 2026.
Scope of Work
This solicitation requires the repair of POWER SUPPLY DRAWERs (CAGE K0735, Ref. No. A1-98450) to meet their original operational and functional requirements. Contractors must perform all repair work in accordance with their standard practices, manuals, and directives, including drawings, technical orders, and approved repair standards. Key requirements include physical identification per MIL-STD-130 and strict adherence to mercury-free specifications, critical for use on submarines/surface ships. Government Source Inspection (GSI) is required.
Contract & Timeline
- Type: Firm-Fixed Price (bilaterally definitized after award)
- Option: Government intends to add an option for increased quantity (179 days).
- Priority: Rated order for national defense use (Defense Priorities and Allocations System regulation, 15 CFR 700). Accelerated delivery is encouraged.
- FOB: Origin
- Quote Due: April 2, 2026, at 8:30 PM EDT
- Published: March 3, 2026
Submission Requirements
Quotes must include:
- Unit Price and Total Price
- Repair Turnaround Time (RTAT) in days (measured from physical receipt of asset to Government acceptance).
- Awardee CAGE, Inspection & Acceptance CAGE, and Facility/Subcontractor CAGE (if different).
- Return Material Authorization # (RMA), if applicable. Contractors must verify nomenclature, part number, and NSN prior to responding.
Additional Notes
The contractor is responsible for all inspection requirements and must perform testing per original manufacturer's specifications, maintaining records for 365 days. Packaging shall be in accordance with MIL-STD 2073. Information on obtaining referenced documents (e.g., MIL-STD-130, MIL-STD 2073) is provided, including contacts for specific types of publications.