Power Supply to South LAMS
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Air Force is conducting a Sources Sought for the design, installation, testing, and commissioning of a permanent Electrical Power Supply System for the South LAMS (Large Aircraft Maintenance Shelter) at Air Base 71, Câmpia Turzii, Romania. This project aims to replace temporary generator power with a stable, utility-fed 120 kW supply to support aircraft maintenance operations. Responses are due April 17, 2026.
Scope of Work
The contractor will furnish all labor, materials, equipment, and supervision to deliver a fully functional electrical power system. Key tasks include:
- Installation of a 315 A switch in the existing electrical panel.
- Excavation of a 156-meter trench (80-90 cm deep) for conduit installation.
- Installation of Ø110 mm protective conduits, including two spare conduits for future expansion.
- Installation of underground copper power cables sized for a 120 kW load (3x1x240 mm² phase, 1x1x120 mm² neutral).
- Installation of a new external electrical panel with a 250 A switch and revenue metering.
- Construction of a grounding electrode system and installation of lightning protection.
- All necessary civil engineering works and full site restoration.
Requirements & Standards
The installed system must provide 120 kW electrical power at 230/400 V, 50 Hz, with a grounding resistance of less than 4 ohms. All work must comply with international standards (IEC 60364, IEC 61439, IEC 62305) and relevant Romanian construction, safety (e.g., Law 319/2006), and environmental regulations.
Contract & Timeline
- Type: Sources Sought / Market Research
- Period of Performance: 45 working days after material availability.
- Place of Performance: Air Base 71, RoAF Câmpia Turzii, Romania.
- Set-Aside: None specified (market research stage).
- Response Due: April 17, 2026, by 12:00 PM Z.
- Published: April 8, 2026.
Evaluation
Responses will be used for market research to identify qualified firms and assess industry capabilities for this critical infrastructure project. This notice is for planning purposes only and does not constitute a solicitation.
Additional Notes
The contractor is responsible for providing all labor, materials, and equipment. Personnel must comply with USAF and RoAF base access procedures, requiring seven working days' advance notice for Romanian nationals. Strict adherence to safety regulations (LOTO, trenching standards, PPE) is mandatory. A one-year warranty on all electrical line work is required. Deliverables include as-built drawings, testing documentation, and material certificates.