P596 POWERTRAIN (ENGINES ASSEMBLY) FACILITY PROJECT AT CORPUS CHRISTI ARMY DEPOT (CCAD) NAVAL AIR STATION CORPUS CHRISTI, TEXAS.

SOL #: N6945023R0022Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
NAVFACSYSCOM SOUTHEAST
NAS JACKSONVILLE, FL, 32212-0030, United States

Place of Performance

Corpus Christi, TX

NAICS

Industrial Building Construction (236210)

PSC

Construction Of Maintenance Buildings (Y1EB)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 7, 2023
2
Last Updated
Jul 27, 2023
3
Submission Deadline
Jul 28, 2023, 10:30 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

DESCRIPTION OF ACQUISITION1. This acquisition will result in the award of a Firm-Fixed Price (FFP) contract for Design-Bid-Build (DBB) construction.2. The intent of the project is to construct a new Powertrain Facility (Engines Assembly) CorpusChristi Army Depot at NAS Corpus Christi, Texas to house rotary wing component rebuild activities. Primaryfacilities include an Aircraft Component Repair Shop (ACRS) (140,083 SF building) with open Flex Spaceto house rotary wing component rebuild and maintenance processes and space to house supervision, latrine,and miscellaneous support space; an Administrative Support Facility (65,840 SF building) to includeadministrative space and depot command headquarters; Central Energy Plant (10,260 SF building), specialfoundations, mass notification systems, fire protection, and alarm systems, Energy Monitoring and ControlSystem connection, Antiterrorism Measures, Post Construction Contract Award Services (PCAS), andBuilding Information Systems.Supporting facilities include utilities (electrical service, water, sewer, and natural gas), paving,walks, curbs and gutters, storm drainage, site improvements (to include relocation of playing fields andjogging track), landscaping, low impact development measures, and information systems.3. The contract completion schedule for the entire project is a total of 900 calendar days from dateof contract award. The total project magnitude is between $25,000,000 and $100,000,000.4. The Government intends to award a contract resulting from this solicitation to the responsibleOfferor whose proposal represents the best value after evaluation in accordance with the factors and theirrelative importance in the solicitation.5. This acquisition will be solicited on an unrestricted basis with full and open competition.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 13Viewing
Solicitation
Posted: Jul 27, 2023
Version 12
Solicitation
Posted: Jul 14, 2023
View
Version 11
Solicitation
Posted: Jul 11, 2023
View
Version 10
Solicitation
Posted: Jun 30, 2023
View
Version 9
Solicitation
Posted: Jun 30, 2023
View
Version 8
Solicitation
Posted: Jun 26, 2023
View
Version 7
Solicitation
Posted: Jun 15, 2023
View
Version 6
Solicitation
Posted: Jun 7, 2023
View
Version 5
Solicitation
Posted: May 19, 2023
View
Version 4
Solicitation
Posted: May 4, 2023
View
Version 3
Solicitation
Posted: Apr 26, 2023
View
Version 2
Pre-Solicitation
Posted: Apr 12, 2023
View
Version 1
Pre-Solicitation
Posted: Apr 7, 2023
View
P596 POWERTRAIN (ENGINES ASSEMBLY) FACILITY PROJECT AT CORPUS CHRISTI ARMY DEPOT (CCAD) NAVAL AIR STATION CORPUS CHRISTI, TEXAS. | GovScope