Pre-Solicitation Notice - Air Force Reserve Combined A-E IDIQ
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
This is a synopsis for an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts under an umbrella Multiple Award Task Order Contract (MATOC) pool. The MATOC will be utilized for a variety of Architect/Engineer (A/E), Value Engineering (VE), Value Analysis (VA), Value Management (VM) services, detailed below. These projects may support design/build (D/B) or design/bid/build (D/B/B) delivery methods for and include highly complex horizontal and vertical design requirements for the Air Force Reserve. Please see the attachment for all requirement details. Synopsis has been amended to incorporate the correct Submission Time of 2359 Eastern Time on 30 October 2025. No other changes have been made. For further details, PLEASE SEE Synopsis - AMDT 0002 in the document sections of the Solicitation on PIEE and SAM.gov.