ERCIP Microgrid and Power Generation Infrastructure at White Sands Missile Range (WSMR) - Las Cruces, New Mexico

SOL #: W912QR26RA042Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

White Sands Missile Range, NM

NAICS

Power and Communication Line and Related Structures Construction (237130)

PSC

Construction Of Other Utilities (Y1NZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 27, 2026
2
Last Updated
Apr 27, 2026
3
Submission Deadline
May 19, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, W072 ENDIST LOUISVILLE, has issued a solicitation for the Energy Resilience Conservation Investment Program (ERCIP) Microgrid and Power Generation Infrastructure project at White Sands Missile Range (WSMR), New Mexico. This is a Total Small Business Set-Aside for a Firm Fixed-Price construction contract. The full solicitation package is restricted and requires specific access procedures. Proposals are due May 19, 2026.

Scope of Work

This opportunity involves the construction of microgrid and power generation infrastructure. A specific component of the project includes the requirement for three Grundfos Model CRNE 20-8 A-P-A-E-HQQE vertical multistage centrifugal pumps with integrated frequency converters for the Reverse Osmosis system at the Water Treatment Plant at Stallion Range Center, WSMR. These pumps are necessary to replace existing units, reduce electrical inrush current, and integrate with the proprietary system.

Contract & Timeline

  • Contract Type: Firm Fixed-Price (FFP) construction contract.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Solicitation Due: May 19, 2026, 2:00 PM EDT / 12:00 PM MDT.
  • Published Date: April 27, 2026.
  • Site Visit: An organized site visit is scheduled for April 23, 2026, at 10:00 AM MDT at the White Sands Missile Range North Gate. Participants must sign up by April 20, 2026, 3:00 PM EST, by emailing Form 300, Form 301, and Photography and WSMR/UXO Briefing Acknowledgment to Norma.A.Ward@usace.army.mil.

Accessing Restricted Solicitation Documents

The full solicitation and attachments contain Federal Contract Information (FCI) or Controlled Unclassified Information (CUI) and are restricted. To gain access:

  1. Ensure your firm has an active SAM Registration.
  2. Ensure your firm has a current BASIC confidence level in the Supplier Performance Risk System (SPRS), in accordance with DFARS clause 252.240-7997 and NIST SP 800-171.
  3. Email a request to Adam Brooks (adam.m.brooks@usace.army.mil) and Bjorn Hale (bjorn.t.hale@usace.army.mil), including your company's CAGE Code, Unique Entity Identifier (UEI), and confirmation of SPRS BASIC confidence level.
  4. Access will be granted within the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module upon Government confirmation.

Mandatory CMMC Requirement

This solicitation requires CMMC Level 2 (Self) for any contractor and/or subcontractor information system that will process, store, or transmit FCI or CUI during contract performance. Offerors must possess the required current CMMC status posted in SPRS prior to award to be eligible.

People

Points of Contact

Files

Files

Download
Download
Download
Download

Versions

Version 7Viewing
Solicitation
Posted: Apr 27, 2026
Version 6
Solicitation
Posted: Apr 20, 2026
View
Version 5
Solicitation
Posted: Apr 20, 2026
View
Version 4
Solicitation
Posted: Apr 15, 2026
View
Version 3
Solicitation
Posted: Apr 14, 2026
View
Version 2
Solicitation
Posted: Apr 14, 2026
View
Version 1
Pre-Solicitation
Posted: Feb 27, 2026
View