Pre-Solicitation Oil Water Separator Design/Install - Mountain Home AFB, ID

SOL #: 6c07374dc20c4c2da3afcbeefd2dd1a0Special Notice

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA4897 366 CONS PKP
MOUNTAIN HOME AFB, ID, 83648-5296, United States

Place of Performance

Mountain Home AFB, ID

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Miscellaneous Buildings (Z2JZ)

Set Aside

Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) (WOSB)

Timeline

1
Posted
Jan 14, 2026
2
Action Date
Jan 29, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

THIS IS A PRESOLICITATION ANNOUNCEMENT ONLY.  THERE IS NO SOLICITATION AVAILABLE AT THIS TIME.  REQUESTS FOR A SOLICITATION WILL NOT RECEIVE A RESPONSE.

Mountain Home Air Force Base/366 Contracting Squadron has a construction requirement for a oil/water separator:

Description: The contractor shall furnish all personnel, equipment, supervision, and materials necessary to design, fabricate, install, and commission a complete and functional 300 Gallons Per Minute (GPM) Oil Water Separator (OWS) system that will be fully integrated into the existing facility infrastructure IAW the SOW.

Disclosure of the magnitude: $250,000 to $500,000

Location: Hush House located in Mountain Home Air Force Base, Idaho, 83648. Upon award, contracting will release more information to the apparent awardee on specific location of building.

Tentative dates:

Projected Solicitation Release: 29 JAN 26

Projected Invitation for Bids Response Date: 28 FEB 26 by 10AM (MST)

Projected Contract Completion Date: 50 calendar days after issue of Notice to Proceed (NTP)

Small Business Set Aside: This requirement will be set aside for Woman Owned Small Business  (WOSB) 

No amount will be charged or reimbursed for the solicitation documents 

People

Points of Contact

Gage BergmanPRIMARY
SrA Deivid BaezSECONDARY

Files

Files

Download

Versions

Version 1Viewing
Special Notice
Posted: Jan 14, 2026
Pre-Solicitation Oil Water Separator Design/Install - Mountain Home AFB, ID | GovScope