Preparation & Preservation of Potable Water Tanks Onboard Submarine

SOL #: N6278926Q0012Combined Synopsis/Solicitation

Overview

Buyer

Dept Of Defense
Dept Of The Navy
SUP OF SHIPBUILDING GROTON
GROTON, CT, 06340-4990, United States

Place of Performance

CT

NAICS

Ship Building and Repairing (336611)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Ships, Small Craft, Pontoons, And Floating Docks (J019)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 3, 2026
2
Last Updated
Apr 20, 2026
3
Submission Deadline
Apr 22, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Navy / SUP OF SHIPBUILDING GROTON is soliciting quotations for the Preparation & Preservation of Potable Water Tanks #1 and #2 onboard a submarine at Naval Submarine Base New London, CT. This is an Unrestricted acquisition under NAICS 336611. Quotations are due April 22, 2026, at 5:00 PM EST.

Scope of Work

This requirement involves two distinct phases:

  • Preparation: Abrasive blasting to near white metal (SSPC-SP-10) or power tool cleaning (SSPC-SP-11) for inaccessible areas, and feathering of adherent paint. This supports government-performed Non-destructive Testing (NDT).
  • Preservation: Restoration of the preservation system within the tanks after NDT. The work is non-consecutive, requiring the contractor to perform preparation, depart for Navy NDT, and then return for preservation. The successful offeror must work 7 days per week, 2 shifts per day until task completion.

Contract & Timeline

  • Type: Firm Fixed-Price (RFQ over SAT)
  • NAICS: 336611 (Size Standard: 1,300 employees)
  • Period of Performance: June 3, 2026 – July 17, 2026. Specific vendor responsibilities: Preparation (June 3-17, 2026), Preservation (July 6-17, 2026).
  • Response Due: April 22, 2026, 5:00 PM EST.

Key Requirements

Offerors must demonstrate:

  • Qualifications: AMPP C7, AMPP C12, AMPP C14, AMPP CAS LEVEL 2, and QP-1 certifications.
  • Cybersecurity: CMMC Level 1; SELF Certified in the Supplier Performance Risk System (SPRS) module within PIEE.
  • Personnel: All contractor personnel must be U.S. citizens. DBIDS credentials may be required for base access.
  • Safety: Tanks must be certified safe for entry by a Marine Chemist. Compliance with all OSH and EP rules.
  • Logistics: Vendors must bring sufficient power; a 60-amp receptacle is available on the pier. Fuel is allowed on base under DOT regulations. All paint and documentation must be approved by CHRIMP.

Submission & Evaluation

Quotations must include total price broken down by CLINs (0001: Prepare Tanks, 0002: Preserve Tanks, 0003: Material Costs, 0004: Travel/Per Diem) with detailed justifications. Submissions are via email to andrea.a.cook.civ@us.navy.mil and stephanie.l.neale.civ@us.navy.mil, with the RFQ number (N62789-26-Q-0012) in the subject line. Award will be made to the responsible vendor offering the best value. Evaluation factors are weighted:

  1. Technical Qualification (.5): Credentials, technical understanding, financial resources, personnel, equipment, project management, SAM.gov active, CMMC compliance.
  2. Past Performance (.3): Summary of 3 most recent contracts, CPARS, SAM.gov.
  3. Price (.2): Reasonableness, realism, affordability. An active SAM.gov registration is mandatory.

Additional Notes

A Wage Determination for Groton, CT, is attached. NAVSEA Drawing #7066246 Rev XA is available upon request for companies preparing quotations.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 6Viewing
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
Version 5
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 4
Combined Synopsis/Solicitation
Posted: Apr 8, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 7, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 6, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 3, 2026
View