SOLICITATION FOR NEW RESIDENTIAL HOUSING CONSTRUCTION IN SEWARD, ALASKA

SOL #: 70Z08726RMISC13611688Solicitation

Overview

Buyer

Homeland Security
Us Coast Guard
CEU JUNEAU(00087)
JUNEAU, AK, 99802, United States

Place of Performance

Seward, AK

NAICS

New Single-Family Housing Construction (except For-Sale Builders) (236115)

PSC

Construction Of Other Residential Buildings (Y1FZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 21, 2026
2
Last Updated
May 15, 2026
3
Submission Deadline
May 21, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Coast Guard (USCG) Shore Infrastructure Logistics Center (SILC), in support of Civil Engineering Unit - Juneau (CEUJ), is soliciting proposals for the construction of new residential housing in Seward, Alaska. This project, identified as PN: 13611688, requires the construction of three new duplex-type housing units, with an optional bid item for a maintenance support building. This is a Total Small Business Set-Aside. Proposals are due May 21, 2026, at 1:00 PM AKST.

Scope of Work

The contractor will provide all necessary labor, materials, equipment, transportation, disposal, and supervision for the construction of:

  • Three new duplex housing units (including 3-bedroom, 4-bedroom, and ADA accessible 4-bedroom configurations).
  • An optional maintenance support building (shop area, office area, restroom facilities). The work includes typical trades for new housing construction, earthwork, utilities, and services, to be performed on U.S. Government-owned lots. All work must adhere strictly to Specifications for PN 136116880, Drawings for PN 13611688, and applicable wage rates. Offerors must possess residential building experience.

Contract Details

  • Contract Type: Firm-fixed price construction.
  • Period of Performance: 545 days from Notice to Proceed.
  • NAICS Code: 236115 (New Single-Family Housing Construction) with a Small Business Size Standard of $45M.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Estimated Award Date: June 6, 2026.

Submission & Evaluation

Proposals must be submitted via email to Cheryl.A.Berry@uscg.mil and john.wright@uscg.mil. Email submissions are limited to 20MB. Offerors must provide a Bid Bond of 10% of the proposed price, completed CLIN pricing, and a summary price breakdown. All solicitation amendments must be acknowledged. Offerors who have previously submitted a proposal are required to resubmit their proposal and are encouraged to submit their best and final offer. Evaluation will be based on a best-value tradeoff process, considering technical factors (Planned Approach, Prior Experience, Past Performance) and Price. Technical factors, when combined, are approximately equal to price.

Key Dates

  • Offer Due Date: May 21, 2026, 1:00 PM AKST.
  • RFI Period: Closed.
  • Pre-Proposal Conference: March 12, 2026, 9:30-10:30 AM AKST (Past).
  • Site Visit: March 17, 2026, 1:00 PM AKST (Past).

Additional Notes

Multiple amendments (0001-0007) have been issued, providing answers to RFIs, incorporating revised documents (e.g., Geotechnical Report, revised Pricing Schedule with optional material upgrades), and updating submission details. The latest amendments (0006 and 0007) confirmed the final proposal due date and the mandatory resubmission for previously submitted offers. Key attachments include forms for prior experience (Attachment A & B), stakeholder contact information (Attachment D), and various bond forms (SF24, SF25, SF25A).

People

Points of Contact

John WrightPRIMARY
Cheryl BerrySECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 9Viewing
Solicitation
Posted: May 15, 2026
Version 8
Solicitation
Posted: May 8, 2026
View
Version 7
Solicitation
Posted: Apr 15, 2026
View
Version 6
Solicitation
Posted: Apr 10, 2026
View
Version 5
Solicitation
Posted: Apr 1, 2026
View
Version 4
Solicitation
Posted: Mar 23, 2026
View
Version 3
Solicitation
Posted: Mar 12, 2026
View
Version 2
Solicitation
Posted: Mar 5, 2026
View
Version 1
Pre-Solicitation
Posted: Jan 21, 2026
View
SOLICITATION FOR NEW RESIDENTIAL HOUSING CONSTRUCTION IN SEWARD, ALASKA | GovScope