PRESSURE SWITCH
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Weapon Systems Support Mech, is soliciting for the manufacture of a PRESSURE SWITCH. This opportunity requires adherence to specific material, physical, and marking standards, including COMETTO P/N: C291.0083.00 (PRESSURE SWITCH) CAGE CODE (A5383). Government Source Inspection is required. Proposals are due June 26, 2026.
Scope of Work
This contract/purchase order covers the manufacture of a PRESSURE SWITCH. Key aspects include meeting specified material and physical requirements, adhering to military standards for marking (MIL-STD-130, MIL-STD-1285, MIL-STD-454, MIL-P-15024/5), and following MIL-STD-973 for configuration control, including submission of Engineering Change Proposals, Deviations, and Waivers to NAVICP-MECH.
Requirements
The PRESSURE SWITCH must meet the material and physical requirements for COMETTO P/N: C291.0083.00 (PRESSURE SWITCH) CAGE CODE (A5383). Marking shall comply with MIL-STD-130 for mechanical parts, MIL-STD-1285 for electrical/electronic parts, MIL-STD-454 for electronic equipment, and MIL-P-15024/5 for electrical equipment. Configuration control is governed by MIL-STD-973, Paragraph 5.4.8, requiring specific procedures for ECPs, Deviations, and Waivers.
Contract & Timeline
- Type: Solicitation (for a contract/purchase order)
- Set-Aside: None specified
- Product Service Code: 99 (Miscellaneous)
- Response Due: June 26, 2026, 8:30 PM EDT
- Published: May 27, 2026, 7:10 AM EDT
Quality Assurance & Packaging
The contractor is responsible for all inspection requirements and ensuring compliance. The Government reserves the right to perform inspections. Records of inspection work must be maintained for 365 days post-delivery. Government Source Inspection per FAR 52.246-2 is required. Packaging must comply with MIL-STD 2073.
Additional Notes
This is a commercial brand name description; alternate items require a complete technical description for government review. Detailed instructions are provided for ordering various military specifications and standards, including those from DODSSP, Indian Head Division, Naval Surface Warfare Center, and NAVICP-MECH. Electronic issuance of contractual documents is standard.