Process Vacuum Pump

SOL #: C26-021Pre-Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8125 AFSC PZIMA
TINKER AFB, OK, 73145-3303, United States

Place of Performance

S Coffeyville, OK

NAICS

Air and Gas Compressor Manufacturing (333912)

PSC

Compressors And Vacuum Pumps (4310)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 23, 2026
2
Response Deadline
Jan 26, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force (DEPT OF DEFENSE), specifically FA8125 AFSC PZIMA, has issued a Presolicitation for a Process Vacuum Pump system. This opportunity seeks a contractor to provide a turnkey solution for the addition of an oil-lubricated rotary screw vacuum pump and an integrated control panel to an existing system, ensuring fully redundant operation. The project includes all materials, labor, site preparation, delivery, installation, and commissioning. The place of performance is S Coffeyville, OK.

Scope of Work

The contractor will provide a new Quincy QSV-530 rotary screw vacuum pump or equivalent, with a nominal capacity of 510 CFM and a vacuum range of 18" HgV to 29.9" HgV. Key specifications include 480V, 3-phase, 60 Hz electrical requirements, maximum dimensions of 51" L x 38" W x 44" H, and a Variable Speed Drive system. The pump must feature oil/air separation, an oil cooler, a condensate system, an automatic inlet valve, air-cooled sound-insulated enclosure, real-time monitoring, automatic restart, and a maximum noise level of 76 dB. A comprehensive 2-year warranty covering parts and labor, including periodic PM costs, is required.

An integrated control system is also required, featuring lead/lag sequencing for optimal energy efficiency. The PLC controller must support OPC UA (preferred) or BACnet protocol, comply with ISO 62443 security, and allow secure wired remote access via Tinker AFB's intranet. Automation capabilities include scheduling, alarm notifications, historical data logging, energy management, and custom control routines. A HTML-based touchscreen HMI will display vacuum levels, pump temperature, operational status, fault codes, and alarms.

Project execution involves furnishing all labor, equipment, materials, and tools for installation and commissioning, including start-up procedures and full capacity testing. Deliverables include detailed PLC controller information, data tag documentation, comprehensive as-built documentation (drawings, specifications, BOM, O&M manuals), and on-site training for operators and maintenance staff.

Contract & Timeline

  • Type: Presolicitation
  • Product/Service Code: 4310 (Compressors And Vacuum Pumps)
  • Response Date: January 26, 2026, 4:00 PM EST
  • Published Date: January 23, 2026, 5:17 PM EST
  • Set-Aside: Not specified

Additional Notes

This is a presolicitation notice, indicating an upcoming solicitation. Interested parties should review the detailed requirements for the vacuum pump, integrated control system, and project execution.

People

Points of Contact

Shana MandleyPRIMARY
Sheridan RobisonSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Jan 23, 2026
Process Vacuum Pump | GovScope