Procurement of NUT,HEX .62-11 UNC
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy (NAVSUP WEAPON SYSTEMS SUPPORT MECH) is seeking quotations for the procurement of 161 units of NUT, HEX .62-11 UNC (NIIN: 016410096). This is a Solicitation issued as an 8(a) Sole Source (FAR 19.8) opportunity. The required nuts are designated as "SPECIAL EMPHASIS" (Level One) due to their critical use in shipboard systems. Quotations are due by May 4, 2026.
Scope of Work
This requirement is for "NUT, HEX 62-11 UNC" (NSN 5310-01-641-0096). Key technical requirements include:
- Adherence to specific quantitative chemical and mechanical analysis per ASTM-B348.
- Performance testing, including Dye Penetrant Inspection for Non-Magnetic Grades and compliance with tensile strength and torque requirements (NASM25027 modified).
- Critical traceability and certification, requiring detailed data reports and material marking.
- Compliance with MIL-STD-2073 and MIL-STD-129 for packaging and marking.
- Hazardous material identification and Material Safety Data Sheets are required if applicable.
Contract & Timeline
- Type: Solicitation (Request for Quotations - RFQ)
- Set-Aside: 8(a) Sole Source (FAR 19.8)
- Rating: "DO" rated order, certified for national defense use under DPAS.
- Flexibility: Issued pursuant to Emergency Acquisition Flexibilities (EAF).
- Delivery: 365 days after the effective date of the contract.
- Inspection/Acceptance: At Origin.
- Quotations Due: May 4, 2026.
- Certification Data CDRLs: Required 20 days prior to scheduled delivery.
Submission & Evaluation
Quotations must be submitted by the specified due date. Evaluation will focus on compliance with the detailed technical, material, and performance requirements outlined in the solicitation. Portsmouth NSY will review/accept Certification CDRLs within 6 working days of receipt.
Additional Notes
The DODAAC for Portsmouth NSY has changed from NOO102 to N50286. The DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file. For inquiries, contact Alana Boyer at ALANA.M.BOYER2.CIV@US.NAVY.MIL.