Z--Provide Maintenance Repairs for Elevator Cables an
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for Maintenance Repairs for Elevator Cables and Painting of Structure at Mammoth Cave National Park, Kentucky. This project involves the complete repainting of the structural steel elevator shaft and full replacement of deteriorated lift cables within the confined, damp, and enclosed vertical shaft. This is a Total Small Business Set-Aside. Quotes are due by May 13, 2026, at 1:00 PM EST.
Scope of Work
The project requires the repainting of approximately 270 vertical feet of structural steel elevator shaft and the replacement of all deteriorated lift cables. The elevator is currently inoperable, and cable replacement is a priority before coatings application. Key tasks include:
- Cleaning and preparing all structural steel framing, ladders, and landings.
- Applying rust-inhibitive primer and high-performance epoxy topcoats (e.g., Noxyde or Sherwin Williams Macropoxy 646/Fast Clad HB).
- Installing new elevator lift cables and governor ropes conforming to NEII and ANSI A17.1 code requirements.
- Implementing stringent environmental containment, ventilation (negative-pressure with HEPA/LEL monitoring), and worker safety controls (OSHA 29 CFR 1926, NFPA 101, NPS cave protection standards).
- Hot work/fire watch procedures as needed for weld repairs.
- A licensed elevator technician is required on-site for critical functions.
- Existing coatings are non-hazardous; lead abatement was completed in 2015.
Contract Details
- Contract Type: Single Firm-Fixed Price Contract.
- Period of Performance: May 18, 2026, to March 01, 2027.
- Set-Aside: 100% Small Business (NAICS 238290, $22,000,000 size standard).
- Bonds & Insurance: 100% performance and payment bonds, and insurance certificate required within 10 days of award.
- Wage Determination: Service Contract Act Wage Determination No. 2015-4679, Revision No. 30, applies for Edmonson County, Kentucky, including elevator mechanics/technicians.
Submission & Evaluation
- Submission Due Date: May 13, 2026, at 1:00 PM EST.
- Submission Method: Electronically to edward_dingle@ios.doi.gov.
- Evaluation Criteria: Best Value – Lowest Priced Technically Acceptable (LPTA). Factors include Price, Technical Ability and Approach, and Past Performance. Technical and Past Performance, combined, are approximately equal to cost/price.
- Eligibility: Offerors must have current Representations and Certifications in SAM.gov and be registered.
- Site Visit: A mandatory site visit was held on May 04, 2026. Bidders are responsible for understanding site conditions.
- Questions: Responses to vendor questions have been provided in Amendment 0002 (Attachment 0006).
Key Clarifications & Attachments
Amendment 0002 provides crucial clarifications, including:
- Acceptability of recent and relevant PPQs from other agencies.
- Confirmation that SSPC/AMPP QP-2 certification is not required, but applicable SSPC standards must be followed.
- Typical work hours are Mon-Fri, 7:00 am to 6:00 pm, with potential for approved weekend/night work.
- Bid bonds are not required.
- New attachments include As-Built drawings, general drawings, and elevator shaft plans (Attachments 0007, 0008, 0009).