Provision & Installation of RTU (YORK) HVAC

SOL #: 19PK3326Q1011Solicitation

Overview

Buyer

State
State, Department Of
US EMBASSY ISLAMABAD
WASHINGTON, DC, 20520, United States

Place of Performance

North Brunswick, NJ

NAICS

Plumbing (238220)

PSC

Air Conditioning Equipment (4120)

Set Aside

No set aside specified

Timeline

1
Posted
Jan 8, 2026
2
Submission Deadline
Jan 24, 2026, 4:59 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Embassy, Islamabad (under the Department of State) is soliciting bids for the Provision & Installation of RTU (YORK) HVAC systems. This opportunity is for a Firm-Fixed Price Purchase Order to replace HVAC Roof Top Package Units at the new embassy compound in Islamabad, Pakistan. The solicitation is open to all relevant vendors, with proposals due by January 23, 2026.

Scope of Work

This turnkey project requires the contractor to supply and install new HVAC Roof Top Package Units (RTUs) for warehouse buildings. The comprehensive scope includes:

  • Supply: New RTU units (ASHRAE 90.1, 62.1 compliant), air devices, duct accessories (ASHRAE 55, SMACNA compliant), ducting/modifications (SMACNA compliant), electrical materials (NEC, ASHRAE compliant), and Building Automation System (BAS) devices (ASHRAE Guideline 13 compliant).
  • Services: Decommissioning and dismantling existing RTUs, modifying concrete pads and duct connections, safely shifting and installing new RTUs (mechanical, electrical, control connections per ASHRAE, SMACNA standards), comprehensive testing and commissioning (ASHRAE Guideline 1.1), balancing the new HVAC system (ASHRAE 111, SMACNA), and providing training to the Post maintenance team.
  • Warranty: A minimum one-year warranty on all supplied items and standard maintenance services during the warranty period are required.

Contract & Timeline

  • Contract Type: Firm-Fixed Price Purchase Order.
  • Period of Performance: Supply and delivery are estimated for 6-8 months from contract award, followed by 30 days for installation, testing, commissioning, training, and closeout.
  • Place of Performance: Warehouse buildings in the new embassy compound (NEC), Islamabad, Pakistan.
  • Response Due: January 23, 2026, via email to AliZ4@state.gov and HussainM3@state.gov.
  • Published Date: January 8, 2026.
  • Bid Validity: Bids must be valid for 15 days from the closing date.
  • Payment Terms: Payment will be processed via EFT within 30 days of receiving a correct and accepted invoice.

Evaluation

Award will be based on Lowest Price Technical Acceptability. Key evaluation factors include:

  • Assurance of genuine parts provision.
  • Sound technical expertise in repair and maintenance.
  • Service delivery time.
  • Competitive pricing.
  • Submission Requirements: Quotations must be on company letterhead, include a list of clients for similar items within the last two years, confirm international warranty claims, accept Net 30-day payment terms, and provide a tax-free quote. Bidders must have a valid DUNS Number and SAM Registration, a physical business address, and good financial health.

Special Requirements

This is a turnkey project, meaning the contractor is responsible for all labor, materials, equipment, and tools. Compliance with U.S. Embassy health and safety regulations (EM 385-1-1, OSHA standards) is mandatory. Qualified personnel, a designated site supervisor, and adherence to site access procedures (including escorts) are required. Normal working hours are 0800-1630, Monday-Friday, with after-hours work requiring COR approval. All correspondence must reference Request Number 19PK3326Q1011.

People

Points of Contact

Zubair AliPRIMARY
Muzzamil HussainSECONDARY

Files

Files

Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Jan 8, 2026
Provision & Installation of RTU (YORK) HVAC | GovScope