Pump, Axial Pistons
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Oklahoma City intends to issue a presolicitation for Axial Piston Pumps (NSN: 1650-01-621-4034) as spares for the F-15 aircraft. This requirement is for a limited/sole source procurement under FAR 6.302 and 10 U.S.C. 2304(c)(1). The estimated solicitation issue date is June 24, 2026, with an estimated closing date of July 24, 2026.
Scope of Work
This opportunity is for the procurement of Axial Piston Pumps, Part Number UA544602-4, which provide cooling fluid to the radar tracking system of the F-15 aircraft.
- Dimensions: L=30.5 in, W=20.5 in, H=20.5 in; Weight=5.0 lbs.
- Material: Aluminum and Steel.
- Quantity: Line Item 0001: 19 EA (Minimum: 5 EA; Maximum: 29 EA).
- Destination: SW3211, Tinker AFB, OK.
- Required Delivery: October 29, 2027 (early delivery acceptable).
- Requirements: Qualification requirements exist, IUID requirements apply, no export control.
Contract & Timeline
- Type: Presolicitation (RFP#: SPRTA1-26-R-0292)
- Set-Aside: None (Not set-aside).
- Qualified Source: Triumph Thermal Systems LLC (Cage: 78943).
- Estimated Issue Date: June 24, 2026.
- Estimated Closing Date: July 24, 2026.
- Anticipated Award Date: 60 days after solicitation issuance.
- Published Date: June 9, 2026.
Evaluation
Award will be based on a combination of price and past performance factors. This notice is not a request for competition, as the Government intends to solicit from a limited number of sources. However, all responsible sources may submit a capability statement, proposal, or quotation within 45 days of the synopsis publication, which will be considered for determining whether to conduct a competitive procurement.
Additional Notes
The Government is not using policies for the acquisition of commercial items (FAR Part 12). The contract is contingent upon the availability of appropriated funds. Electronic procedures will be used, and the solicitation will be available for download only at SAM.gov. An Ombudsman is available for concerns regarding the acquisition process (405-855-3552).