PUMPING UNIT,HYDRAU
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, NAVSUP Weapon Systems Support (WSS) Mechanicsburg, has issued a solicitation for the repair of PUMPING UNIT,HYDRAU. This opportunity seeks qualified contractors to perform repair services with a required Repair Turnaround Time (RTAT) of 202 days. Responses are due by March 24, 2026.
Scope of Work
This solicitation is for the repair of PUMPING UNIT,HYDRAU, identified by CAGE 07309 and Reference Number 115659123. Repair work must adhere to the contractor's standard practices, manuals, and directives, including drawings, technical orders, and approved repair standards. Government Source Inspection (GSI) is required. The contractor is responsible for all inspection and testing per the original manufacturer's specifications. Packaging must comply with MIL-STD 2073.
Contract & Timeline
- Type: Solicitation (RFQ for repair, resulting in a bilateral award)
- Set-Aside: None specified. Only authorized distributors of the original manufacturer's item will be considered; proof required with offer.
- Response Due: March 24, 2026, 8:30 PM EST
- Published: March 4, 2026
Key Requirements & Evaluation
Offerors must provide a quote including unit price, total price, and their proposed Repair Turnaround Time (RTAT). If the proposed RTAT exceeds the Government's required 202 days, capacity constraints must be explained. A significant aspect is the price reduction clause: contractors failing to meet the required RTAT will incur a price reduction per unit/per month of delay, up to a specified maximum. The RTAT is measured from the physical receipt of the F-condition asset at the contractor's facility to its acceptance by the Government. Quotes should also include details for testing and evaluation if an asset is determined Beyond Repair (BR/BER), and a comparison to new unit price and delivery lead-time.
Additional Notes
Freight is handled by Navy CAV or Proxy CAV. Accelerated delivery is encouraged. Offerors must verify nomenclature, part number, and NSN prior to responding. Information regarding ordering applicable documents and distribution statements for government-provided documents is also included.