Purchase Removal and Installation of Shelving Units
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, specifically the FA4803 20 CONS LGCA office, is conducting a Sources Sought to identify capable vendors for the purchase, removal, and installation of shelving units. This market research focuses on a heavy-duty pallet rack shelving system at Charleston AFB, SC. Responses are due by March 6, 2026, at 7:00 PM UTC.
Purpose & Scope of Work
The objective is to install a robust pallet rack shelving system in Building 216 at the 20th Logistics Readiness Squadron, Charleston AFB, SC, and provide continuous support and maintenance. The scope includes:
- Installation of heavy-duty pallet rack shelving units with a 7,000-pound capacity.
- Specific units include 120"x42"x144" units, add-on units, installation kits for rack protectors and pallet racks, and heavy-duty wire decking (58" Wide, 42" Deep).
- Securely anchoring shelving to the floor.
- Removal and disposal of any outdated shelving.
- Continuous support and maintenance of the installed shelving system.
Place of Performance
Work will be performed at the 20th Logistics Readiness Squadron, Building 216, Charleston AFB, SC 29152, United States.
Performance Standards & Requirements
- Adherence to safety regulations and manufacturer specifications.
- Compliance with Air Force Instruction 31-101, Integrated Defense, Chapter 8, DoDM 5100.76, and AFMAN 32-1084.
- Site sanitization to original level upon completion.
- Set-up to be completed within 1 week of beginning on-site work.
Special Conditions
- Contractor must provide a contract manager and alternate.
- Personnel must be proficient in English.
- Compliance with all installation and facility safety and security regulations, including base identification, vehicle passes, and background checks (10 business days prior notice).
- Prohibition of weapons, firearms, and ammunition on base.
- Compliance with OSHA and other applicable safety laws.
- Requirements for materials storage and clean-up.
- Protection of government property.
Key Documents
Several layout diagrams (Layout FRONT.pdf, Layout CAGE.pdf, Layout BACK.pdf) provide visual details of the shelving configuration, including "Starter" and "ADD-ON" components, dimensions (e.g., 382" total width for CAGE, 120" base shelf width), and placement against walls/fences. These are crucial for understanding the physical scope.
Contract & Timeline
- Contract Opportunity Type: Sources Sought
- Set-Aside: None specified
- Response Date: March 6, 2026, 7:00 PM UTC
- Published Date: February 27, 2026, 3:48 PM UTC
Contact Information
- Primary Contact: SSgt James Bridges (james.bridges.6@gmail.com, 803-895-5092)
- Secondary Contact: Joseph Nemedy (joseph.nemedy.1@us.af.mil, 803-895-5354)